Forwards IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. No Response Required
ML19256E701
Person / Time
Site: Beaver Valley
Issue date: 10/29/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
References
NUDOCS 7911150035
Download: ML19256E701 (1)


Text

.

sa nta Y&

[

o UNITED STATES 8 y)^.eq [,,g NUCLEAR REGULATORY COMMISSION

\\

/; e REGION I

,,.yhi[%#[',[

o, 631 PARK AVENUE

,o KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-412 8 1973 Duquesne Light Company ATTN:

Mr. E. J. Weolever Vice President 435 Sixth Avenue Pittsburgh, PA 15219 Gentlemen:

The enclosed IE Bulletin 79-17, Revision 1, is forwarded to you for information.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, "s&d+

~

oyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 79-17, Revision 1 w/ Attachment 2.

List of IE Bulletins Issued in the Last Six Months CONTACT:

L. E. Tripp 215-337-5282 cc w/encls:

R. J. Washabaugh, Quality Assurance Manager 1337 288 791115003 5

ENCLOSURE 1 UNITED STATES SSINS No.:

6820 NUCLEAR REGULATORY COMMISSION Accession No.:

0FFICE OF INSPECTION AND ENFORCEMENT 79082201p7 WASHINGTON, D.C.

20555 IE Bulletin No. 79-17 Revision 1 Date:

October 29, 1979 Page 1 of 5 PIPE CRACKS IN STAGNANT 80 RATED WATER SYSTEMS AT PWR PLANTS Description of Circunstances:

IE Bulletin No. 79-17, issued July 26, 1979, provided information on the R1 cracking experienced to date in safety-related stainless steel piping R1 systems at PWR plants.

Certain actions were required of all PWR R1 facilities with an operating license within a specified 90-day time R1 frame.

After several discussions with licensee owner group representatives and R1 inspection agencies it has been determined that the requirements of Item 2, R1 particularly the ultrasonic examination, may be impractical beceuse of un-R1 availability of qualified personnel in certain cases to complete the in-R1 spections within the time specified by the Bulletin. To alleviate this R1 situation and allow licensees the resources of improved ultrasonic inspec-R1 t'on capabilities, a time extension and clarifications to the bulletin have R1 been made.

These are referencM to the affected items of the original R1 bulletin.

During the period of November 1974 to February 1977 a number of cracking incic:ents have been exnerienced in safety-related stainless steel piping systems and por-tions of syecems which contain oxygenated, stagnant or essentially stagnant bor-ated water.

Metallurgical investigations revealed these crecks occurred in the weld heat affected zone of 8-inch to 10-inch type 304 material (schedule 10 and 40). initiating an the piping I.D. surface and propagating in either an inter-granular or transgranular mode typical of Stress Corrosion Cracking.

Analysis indicated the probable corrodents to be chloride and oxygen contamination in the affected systems.

Plants affected up to this time were Arkansas Nuclear Unit 1, R. E. Ginna, H. B. Robinson Unit 2, Crystal River Unit 3, San Onofre Unit 1, and Surry Units 1 and 2.

The NRC issued Circular No. 76-06 (copy attached) in view of the apparent generic nature of the problem.

T u7 289 During the refueling outage of Three Mi

~

o' this year, visual inspections disclo in the spent fuel cooling system piping removal system.

These cracks were foun DUPLICATE DOCUMENT and later confirmed by liquid penetrant cracking was reported to the NRC in a L Entire document previously 1979.

A preliminary metallurgical anal entered into system under:

section of cracked and leaking weld joi

]

1 No. of pages:

_f I R1 - Identifies those additions or revi