Forwards IE Insp Repts 50-491/79-16,50-492/79-16 & 50-493/79-16 on 790913-14.No Noncompliance Noted
ML19256E359
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 10/05/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19256E357 List:
References
NUDOCS 7911020222
Download: ML19256E359 (2)


See also: IR 05000491/1979016

Text

.

/

o

UNITED STA1ES

8

g

NUCLEAR REGULATORY COMMISSION

o

g,

r

REGION 11

o

101 MARIETTA sT

N.W., SUITE 31oo

o

ATLANTA. GEORGIA 3o3o3

OCT 0 51979

In Reply Refer To:

'

RII:JKR

50-491/79-16

50-492/79-16

50-493/79-16

Lpke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by J. K. Rausch of this office on

September 13-14, 1979, of activities authorized by NRC Construction Permit Nos.

cpi >R-167, CPR-168, and CPPR-169 for the Cherokee Nuclear Station facility, and

to the discussion of our findings held with J. W. Willis at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of .this letter and the enclosed inspection

report will be placed in the NRC's Public Dociment Room. If this report contains

any information that you (or your contractor, believe to be proprietary, it is

necessary that you make a written applicatiou rithin 20 days to this office to

withhold such information from public disclosuce. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part or the

document. If we do not hear from you in this regard within the specified period,

the report will be pleced in the Public Document Room.

<

1259

292

1o20

pg

91

.

CT 0 5 ;g79

'.

. Duke Power Company

,_

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

'

,/

C. E. M'urph ,

ief,

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-491/79-16,

50-492/79-16, 50-493/79-16

~

cc w/ encl:

J. T. Moore, Project Manager

P. O. Box 422

Gaffney, SC 29340

,

,/ *

1259

293