ML19256E102
| ML19256E102 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/30/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19256E097 | List: |
| References | |
| NUDOCS 7910290048 | |
| Download: ML19256E102 (2) | |
See also: IR 05000245/1979019
Text
.
.
,, aga
UNITED STATES
}o
NUCLEAR REGULATORY COMMISSION
y
n
R EGION 1
$
h
631 PARK AVENUa!
- I
f
KING OF PRUSSI A. PENNSYLVANIA 19406
\\*****/
AUG 3 0 1979
Docket No. 50-245
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-245/79-19
This refers to the inspection conducted by Mr. W. D. Shafer of the Performance
Appraisal Branch of Inspection and Enforcement on June 25-29, 1979, at Millstone
Nuclear Power Station, Unit 1, Waterford, Connecticut, of activities authorized
by NRC Operating License No. DPR-21 and to the discussions of our findings held by
Mr. Shafer with Mr. J. F. Opeka and others of your staff at the conclusion of
the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection con 31sted of selective examinations
of procedures and ' representative records, interviews with personnel, and obser-
vations by the inspector.
Based on the results of this inr?ction, it appears that certain of your activities
were not in full compliance wi',i NRC requirements as set forth in the Notice of
Violation, enclosed herewith as Appendix A.
These items of noncompliance have
been categorized into levels as described in our correspondence to you dated
December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's Rules of Practice, Part 2, Title 10, Code of Federal Regulations.
Section
2.201 requires you to submit to this office within twenty (20) days your receipt
of this notice, a written statement or explanation in reply including: (1)
corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
'
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any
'M 7 277
7 0102 900 4- f
.
.
.
-
Northeast Nuclear Energy Co.
2
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within twenty (20) days to this
office to withhold such information from public disclosure. Any such application
must be accompanied by an affidavit executed by the owner of the information,
which identifies the document or parts sought to be withheld, and which contains
a statement of reason which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
n
(
~
El
. Brunner, Chief
Re
to.- Operations and Nuclear
support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-245/79-19
cc w/cncls:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman, Natural Resources Defense Council (Without Report)
99 / 2/8
1