ML19256D610
| ML19256D610 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/28/1975 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19256D611 | List: |
| References | |
| NUDOCS 7910190571 | |
| Download: ML19256D610 (2) | |
See also: IR 05000289/1975009
Text
4
(.
(: .~. ./ ' f &,
UNITED STATES
-
NUCLEAR REGULATORY COMMISSION
REGloN I
$31 PARK AVENUE
'
.
KING OF PRUS$l A. PENNSYLVANI A 19406
APR g S 195
Metropolitan Edison Company
License No. DPR-50
Attention: Mr. R. C. Arnold
Inspection No. 50-289/75-09
Vice President
P.O. Box 542
Reading, Pennsylvania 19603
Gentlemen:
This refers to the inspection conducted by Mr. Gage of this office on
April 15, 1975 at Middletown, Pennsylvania of activities authorized by
AEC License No. DPR-50 and to the discussions of our findings held by
Mr. Gage with Mr. Herbein of your staff at the conclusion of the in-
spection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
\\
.
,
In accordance with Section 2.790 of the AEC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contafps any information that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
information from public disclosure. Any such application must include a
full
tatement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that pro-
prietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
.
'
'
1452
131
qoLUDC4 O
h O(m'cc
+? % T) ?
-
Yk/
7910190 [^[/
_t
- s .#
.
.
Metropolitan Edison Company
-
_2-
-
No reply to this letter is required; however, should you have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
f
Robert T. Carlson, Chief
Facility Construction and Engineering
Support Branch
Enclosure:
"
IE Inspection Report No. 50-289/75-09
}
cc:
J. G. Herbein, Station Superintendent
R. W. Heward, Project Manager, GPUSC
- -
bec:
IE Chief, FS&EB
IE:HQ (4 cys ltr, 5 cys report)
'
)
IE Files-
,
-
Central Mail & Files
~
Directorate of Licensing (4 cys ler,13 cys report)
=
Regul .cory Standards (1 cy ltr, 3 cys report)
Local PDR
.
REG:I Reading Room
-
Region Directors (II, III, IV, V) (Report Only)
ELD
State of Pennsylvania
Miss Mary V. Southard, Chairman, Citizens for a
Safe- Environment
.
1452
132
-