ML19256D579

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/75-17 on 750730-31 & 0801.No Noncompliance Noted
ML19256D579
Person / Time
Site: Crane 
Issue date: 08/19/1975
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19256D577 List:
References
NUDOCS 7910190546
Download: ML19256D579 (2)


See also: IR 05000289/1975017

Text

..{"

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGloN 1

531 PARK AVENUE

.

KING OF PRUS$1 A, PENN5VI.V ANI A 19405

3

)

..

Metropolitan Edison Company

License No. DPR-50

Attention:

Mr. R. C. Arnold

Inspection No. 75-17

-

Vice President

Docket No. 50-289

P. O. Box 542

'

Reading, Pennsylvania 19603

~

dentlemen:

This refers to the inspection conducted by Mr. R. J. Meyer of this

office on July 30, 31 and August 1, 1975 at Three Mile Island 1 of

activities authorized by NRC License No. DPR-50 and to the discussions

of our findings held by Mr. Meyer with Mr. Herbein and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations py the inspector.

Our inspector also verified the steps you have taken to correct the

item of noncompliance brought to your attention in a letter dated

April 9, 1975.

We have no further questions regarding your action at

this time.

,

In addition, our inspector examined those activities conducted und'r

e

your license relating to the subjects covered intyour letters to Director,

Division of Reactor Licensing dated June 2 and July 3, 1975.

We have no

further questions regarding these matters.

.

Within the scope of this inspection, no items of noncompliance were

observed.

,-

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any infornation that you

(or your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

"-

1451

333

(UTrog

$$@

D

ps/

,,,1 o19 o

.t -

.

.

..

// .99

'

,

75

g

.

..

.

.

.

.

.3

i

'

that proprietary information identified in the application is contained

'

~

1a a separate part of the document.

If we do not hear from you in this

regard within che specified period, the report will be placed in the

,

Public Document Room.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss

,

them with you.

'J"

.=

Sincerely,

,

. . . i /- 6-

'

'

'

t<<

,

.

.s

Paul R. Nelson, Chief

Radiological and Enviruwaantal

Protection Branch

Enclosure:

IE:I Inspection Report No. 50-280/75-17

cc:

J. G. Herbein, Manager, Ge.icration Operations - Nuclear

.

R. W. Heuard, Project Mana:ce, GPUSC

. . _ , ,

.

..

,

bec:

I

.

IE Chief, FSSEB

'

IE:HQ (4 cys ler, 5 cys report)

lE Files

Central Mail (.

Files

Directorate of Licensing (4 cys 1::r,13 cys report)

Regulatory Str. Jards (1 cy ler, 3 cys report)

PDR

Local PDR

_

NSIC

~

TIC

REG:I Reading .bom

Region Directcrs (II, III, IV) (Report Only)

ELD

State of Penns,1vania

Miss Mary V. 5..athard, Chairman, Citizens for a

Safe Environment

- -- --~ = m .

ec
ws.:caq c*7 ~ , , . , ,

- - - ~

~

l451

334

T

s

.

.