Jump to navigation Jump to search
Forwards Insp Rept 50-289/73-01 on 730109-11.No Noncompliance Noted
ML19256D521
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/07/1973
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19256D522 List:
References
NUDOCS 7910180834
Download: ML19256D521 (4)


See also: IR 05000289/1973001

Text

.

(N) (W pj Pb t

s

-

-

.

UNITED ST ATES

g[pg , g ,

q**,,

ATOMIC ENERGY COMMISSION

]g

DeRECTORATE OF REGULATORY OPER ATIONS

,

REGION 1

'

970 BRO AD STREET

[S,

f

NEW ARK. NEW JERSEY 07102

%,5 o

~

FEB 7

1973

Metropolitat: Edison Company

Docket No. 50-289

'

Attention: Mr. J. G. Miller

Vica President

P.O. Box 542

Reading, Pennsylvania

Gentleman:

,

This refers to the inspection conducted by Mr. B. K. McLeod,

of this office "on January 9,10 and 11,1973, of activities

authorized by AEC Construction Permit No. CPPR-40 and to the

discussions of our findings held by Mr. McLeod with Messrs.

Klingaman and Herbien of your staff at the conclusion of the

inspection visit and to subsequent telephone discussions be-

tween Mr. McLeod and Mr. Barton on January 22 and 30,1973.

Areas examined during this inspection included tne Preopera-

'

tional Testing Program, Preoperational Test Procedures, Post-

erection Cleaning and Quality Assurance. Within these areas, -

the inspection consisted of selective examinations of proce-

'

dures and representative records, interviews with plant per-

sonnel, and observations by our inspectors.

m

_

In addition, our inspector examined the areas identified as

violations in our letter of October 31, 1972, which were dis-

cussed in your response dated November 20, 1972. The results

of this examination indicate that the ccrrective actions de-

scribed in your letter of November 20, 1972, which were to be

completed by November 30, 1972, have not been completed.

In re-

gard to these outstanding corrective actions, we now understand

that the Test Manual will be approved by the Test Working

Group and issued by January 31', 1973, and that Test Instruc-

tion No. 18 will be approved and issued by February 15, 1973.

It is also our understanding that the Quality Assurance Program

covering testing and startup activities, which was formerly

part of the Test Manual, is being prepared as a separate doc-

ument and that it will be annroved and issued on or before

March 3, 1973. These corree ~.ve actions, which we consider

as firmly committed, will bc verified during a subsequent,

and timely, inspection of your program.

1451

122

3L

2

rg910180

-

_

.

..

-

-

.

-

.

_

.

.

-2-

No new violations or safety items were identified in the areas

examined during this inspection.

The results of our review of your Core Flood Tank Flow Test

Procedure have been referred to Regulatory Operations Head-

quarters for review, evaluation and possible action. You

will be informed of the results of this review.

As a result of the inspection, we wish to confirm our under-

standing of items which were discussed at the conclusion of

i

the inspection. These items, with clarifying co=ments, as

}t

appropriate, are as follows:

1.

All active components, the operating times of which affect

}

!

the ability of systems designed to seismic Category I cri-

teria to pet ?orm their design safety function, will be

functionally tested, where practicable, under the system

conditions of temperature, pressure, differential pressure

and flow that would be expected when those components are

required to operate. During these functional tests, the

elapsed time required for each of these components to r.each

its required operational state will be measured and verified

O-

to be within acceptable limits.

I

2.

The Containment Leak Rate Test will be conducted subsequent

I

to the successful completion of the Containment Structurri

Integrity. Test as required by the American National Stan-

dard N45.4 - 1972, Leakage Rate Testing of[ Containment

Structures for Nuclear Reactors.

.

In accordance with Section 2.790 of the AEC's " Rules of Prac-

.

tice," Part 2, Title 10, Code of Federal Regulations, a copy

l

of this letter and the enclosed inspection report will be

placei in the AEC's Public Document Room.

If this report

conmains an? information that you (or your contractors) be-

lieve to be proprietary, it is necessary that you make a

!

written application within 20 days to this office to with-

hold such information from public disclosure. Any such ap-

plication must include a full statement of the reasons on

the basis of which it is claimed that the infor=ation is

1451

123

-

.

-

~v-- - - ~ . - - - - - - - . . _ . . ,_ __

__

_ __

.

.

..

.

O

-

_3_

proprietary, and should be prepared so that proprietary in-

formation identified in the application is contained.in a

separate part of the document. If we do not hear from you

in this regard within the specified period, the report will

be placed in the Public Document Room.

Should you have any questions concerning this inspection, we

will be ' pleased to discuss them with- you.

.

Sincerely,

J

!

i

'

gg -

s

-

J es P. O'Reilly

-

<'~~ Di ector

Enclosure:

RO Inspection Report 50-289 73-01

!

( ~)

,

cc:

Mr. R. C. Arnold, Manager of Production

Metropolitan Edison Company

,

P.O. Box 542

Reading, Pennsylvania 19603

.

R. M. Klingaman, Superintendent

Three Mile Island Nulcear Station

'

Metropolitan Edison Company

P.O. Box 480

.

Middletown, Pennsylvania 17057

-

Mr. Richard W. Heward, Project Manager

GPU Service Corporation

260 Cherry Hill Road

Parsippany, New Jersey 07054

Mr. Thomas M. Crimmins, Jr.,

Safety and Licensing Manager

GPU Service Corporation

260 Cherry Hill Road

Parsippany, New Jersey 07054

1451

124

--

9

- - ~ . . - _ . .

. _ _ - _ _

_ - - . _ _ .

_ . _ _ .

-

. .

O

-

\\'

-

-4-

bec: RO Chief, Reactor Construction 3 ranch, Ho

RO Chief, Reactor Test &' Operations Branch, HO

RO:HO (4)

RO Directors

Directorate of Licepsing, HQ (4)

DRCentralFiles/

GC

PDR

,

Local PDR

NSIC

DTIE

i

State of Pennsylvania

!

-

,

1

.

I

i

i

i

l

1451

125

c,

!]

'

i

,

.

-

!

. _ _ _ _ _ . _ . _ - _ _

__

_

_

_ _ _ _ _ _ _ _ _ . _ _ _

_ _ _ _

_