ML19256D451

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/73-21 on 731029-31. No Noncompliance Noted
ML19256D451
Person / Time
Site: Crane 
Issue date: 11/20/1973
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
METROPOLITAN EDISON CO.
Shared Package
ML19256D452 List:
References
NUDOCS 7910180788
Download: ML19256D451 (2)


See also: IR 05000289/1973021

Text

PB 6Lc.0%L.

, .. .

.0*

UNITED STATES

[/p,

ATOMIC ENERGY COMMISSION

'

k

centcTon ATE or necut. Atony oPER ATioNS

,

,

prosoN 9

'

'

631 PARK AVENUE

(,

k

N

KING oF PRUSSI A. PENNSYLVANI A 19406,

' orgs s

NOV 2 0 1973

Metropolitan Edison Company

Docket No. 50-289

Att.en tion :

Mr. J. G. Miller

License No. CPPR-40

Vice President

Box 542

Reading, Pennsylvania

19603

Gentlemen:

This refers to the inspection conducted by Mr. Folsom of this office

on October 29-31, 1973 at Middletown, Pennsylvania of activities

authorized by AEC License No. CPPR-40 and to the discussions of our

findings held by Mr. Folsom with Messrs. .Stromberg and Levin of your

-

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Regulatory

Operations Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of . selective exrtinations of

O'

Proceaures e#a rePreseatetive rec ree. taterviews wita Pereo==e1

measurements made by the insp'ector, and observations by the inspector.

Within the scope of this inspection, no violations or safety

items were" observed.

In accordance with Section 2.790 of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

AEC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to

this office to withhold such information from public disclosure.

Any such application must include a full statement of the

,

i

reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary

,

information identified in the application is contained da a

separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be

placed in the Public Document Room.

1449

197

-

8

3910180

/,

,iyy

. - - . - . . .

.

- - - .

..

V'

.

,

.

.

-2-

\\

No repl'f to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

_.-

)

', .

.

s n , .i,

'

'

Robert T. Carlson, Chief

Facility Construction and Engineering

Support Branch

Enclosure

RO Inspection Report No. 50-289 3

.

.

bec (w/encis):

R0 Chief FS&EB

RO:HQ (5)

-3

DL (4 w/encls plus 9 cys of Report Only)

'

DR Central Files -

RS (3)

PDR

Local PDR -

RO Files

,

j

NSIC

t

DTIE

State of Pennsylvania

,

!

!,

1449 .I98

..

i

._

_

.

/

v

-