1 --
. . . .
..
,
,,
,
u.
. .&
.i..
.we
-
.
.
UNITED ST ATES
^
MfN%.
ATOMIC ENERGY COMMISSION
'
DS RE CTO R A f C OF N C GU L. A TO H V Q P C H A TION S
- [g
K+
y
nrcioH e
Tf,
L
631 P ARK AVENUE
i
/
'f
'
.
/5
KING or PRUS$1 A. PENNSYLV ANI A 19406
--%%,QS
MAY 8
1974
License No. CPPR-40
Metropolitan Edison Company
Docket No. 50-289
Attention: Mr. J. G. Miller
Inspection No. 50-289 74-22
Vice President
.
Box 542
Reading, Pennsylvania 19603
,
Gentlemen:
This refers to the inspection conducted by Mr. Folsom of this office
on May 2, 1974 at Middletown, Pennsylvania of activities authorized
-
by AEC uicense No. CPPR-40 and to the discussions of our findings
held by Mr. Folsom with Mr. Stromberg of your staff at the
conclusion of the inspection.
.
"
Areas examined during this inspection are included in the Regulztory
Operations Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel,
-
and observations by the inspector.
Within the scope of this inspection, no violations or safety items
were observed.
In accordance with Section 2.790 of the AEC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
AEC's Public Document Room.
If this report contains any information
that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to
this offica to withhold such information from public disclosure.
include a full statement' of the
Any such application must
ressons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a
If we do not hear from you in
separate part of the document.
this regard within the specified period, the report will be
placed in the Public Document Room.
1449
J87
_
4910180
r'?
.
.t-
. . . ..
n....
- -
. .
'.
...
u.
-:--....
.
. . . .
.
^
, Metropolitan Edison Company
-2-
,
.
No reply to this letter is required; however,- should you have any
questions concerning this inspection, we will be. pleased to discuss
them with you.
Sincerely,
.
A-
)
[#RobertT.Carlson, Chief
Facility Construction and Engineering
Support Branch
-
Enclosure:
R0 Inspection Report No. 30-289/74-22
.
_
.
. Enclosure:
..
-
RO Inspectics Report No. 50-289/74-22
.