ML19256D409

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/74-21 on 740420-22.No Noncompliance Noted
ML19256D409
Person / Time
Site: Crane 
Issue date: 04/26/1974
From: Brunner E, Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19256D410 List:
References
NUDOCS 7910180756
Download: ML19256D409 (2)


See also: IR 05000289/1974021

Text

UNITED STATES

<>

[q[M Q '"

g[Nk]%,

ATOMIC ENERGY COMMISSION

'

conscTon Art or. ncout.Avony open Avions

g

6

7

nsonoM 1

A

5,

'

631 P ARK AVENUE

,

,

C-

1

KING oF PRUSSI A, PENNSYLVANI A 19406

'

s

Metropolitan Edison Company

0 SEE I374

License No'. DPR-50

Attention: Mr. J. G. Miller

Inspection No. 50-2S9

Vice President

P.O. Box 542

Reading, Pennsylvania 19603

Gentlenen:

Thisreferstotheinspectionconductedbybr.Hannonofthisoffice

on April 20-22, 1974 at Three Mile Island Uait 1, Middletown, Penn-

sylvania of activities authorized by AEC License no. DPR-50 and

to the discussions of our findings held by Mr. Hannon with Mr. Eerbein

and other me..tbers of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Regulatory

Operations Inspection Report which is enclosed with this letter.

,

Within.these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel,

and observations by the inspector.

Within the scope of this inspection, no violations or safety items

were observed.

~

'-

In accordance with Section 2.790 of the AEC's " Rules of Practico",

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report vill be placed in the

FC's Public Document Room. If thic report contains any information

that you (or your coatractor) believe to be proprietary, it is

necessary that you make a written application uithin 20 days to

this office to withhold such infomation from public dicciosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary

infomation identified in the application is contained in a

separate part of the docu= cat.

If we do not hear from ycu in

this regard within the specified period, the report vill be

placed in the Public Document Room.-

.

1449 J69

.

.

__

. cress..}L......-.}

b

~

.ma ,.

-.

g---

3

,

RCab.e___

. 3rylner ry*fD

-

<

, - , .

. ,g,gg,n/mj,d, , , Spess.and

Ha

EA

' , , , , .

.unm..

. ..b

% --

'A-d^L

~

9

-

f

.

form AEC.) s (Ar. 914 AECM 0240

I N 910180 7$f

~

Metropolitan Edison Company

-2 -

No reply to this letter is required; however, i.f you should have.

,

any questions c.oncerning this inspection, we will be pleased to

-

C-

discuss them with you.

m

Sincerely,

dB

an

A. B. Davis, Acting for

E. J. Brunner, Chief

-

Reactor Operations Branch

Enclosure:

RO Inspection Report No. 50-289/74-21

.

.

cc's:

R. C. Arnold, Vice President, Generation

J. G. Herbein, Superintendent, Three Mile IslanJ Nuclear Station

R. W. Heward, Project Manager, GPUSC

T. M. Cri= tins, Jr., Safety and Licensing Manager, GPUSC

I

bec: RO Chief, FS&EB

,

l

RO:HQ (4)

DL (4)

RO Files

DR Central Files

RS

PDR

Local PDR

.

'

NSIC

DTIE

State of Pennsylvania

'

REG REG READING ROOM

.

OGC

.

1449

J70

.

.

e

9

mm

._

,

--

.

-

~~