Text

-_

_ . .

.- -

- . - . .

- . . . -

~

.'

..

.

O

4g

UNITED STATES

'

yq

NUCLEAR REGULATORY COMMisslON

'

P-( )

'

O

REGION I

g,

,

b jr.N ,

431 PARK AVENUE

[

KING OF PRUS$1 A. PENNSYLVANI A 19406

.....

Docket No. 50-289

MAY 1 S 1977

.

Metropolitan Edison Company

ATTN: Mr. R. C. Arnold

Vice President

3

!

P.O. Box 542

Reading, Pennsylvania

19603

Gentlemen:

l

Subject:

Inspection 50-289/77-12

This refers to the inspection conducted by Mr. K. Plumlee of this

office on April 15 and 19,1977, at the Three Mile Island Facility,

Middletown, Pennsylvania, of activitias authorized by NRC License No.

!

OPR-50 and to the discussions of our findings held by Mr. Plumlee

l

with Mr. J. Colitz and other members of your staff at the conclusion

of the inspection.

,

Areas examined during this inspection are described in the Office of

i

")

Inspection and Enforcement Inspection Report which is enclosed with this

'

(

~

!

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

,

personnel, measurements made by the inspector, and observations by the

inspector.

i

Our inspector also verified the steps you have taken to correct the

items of noncompliance brought to your attention in a letter dated

December 21, 1976. We have no further questions regarding your

action at this time.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This item of noncompliance has been categorized into the levels

as described in our correspondence to you dated December 31 , 1974.

This notice is sent to you pursuant to the orovisions of Section

2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice,

a written statement or explanation in reply including:

(1) corrective

steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further items of noncompli-

ance; and (3) the date when full compliance will be achieved.

\\bbh

-

t

yg9101

s

,,

,

_

_

___

_

-

-

.. .

'M te ropolitan Edison Company

I

2

MAY 161977

.

,,

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10 Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Puolic Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompr.Rd by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b)(4) of Section 2.790. The

information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be

placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

8

%

Paul R. Nelson, Chief

Fuel Facility and Materials Safety

Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection Report Number

50-289/77-12

cc w/ encl:

J. G. Herbein, Manager, Generation Operations - Nuclear

J. J. Colitz, Unit 1 Superintendent

R. W. Heward, Project Manager, GPUSC

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

id46213

-

.e

u.-

+ =e= = .

-

- - -

.ma.

mw

4.

e