Reports That Certain Preservice Insp Baseline Data Records Have Been Misplaced.Provides List of Missing Info W/Action Planned for Each Case
ML19256D050
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/03/1975
From: Arnold R
METROPOLITAN EDISON CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19256D047 List:
References
GQL-1632, NUDOCS 7910160774
Download: ML19256D050 (9)


Text

~.. @ - / --.,c-7

+ !....

,a p

~c r y n...,,.,,,,

, su r x au

  • TROPOLlTAN EDISON COMPANY :.uc.w.wv:vis:.:r n.auc unura: cowor.a ri: :
CE COX 5<.2 READING.rErJ"JOYLVANIA 19503 TELEPHONG 215 - 023 3'i01 Novenber 3, 1975 Go,L 1632 Director of fluelear Reactor ReCulation U.S. IIuclear Regulatory Co=:ission.

Washing, ton, D.C.

20555 Mr. J. P. O'Reilly.

Office of Inspecticn & Enforcement, Region 1 U.S. !!uelcar Regulatory Cc:=ission 631 Park Avenue King of Prussia, PA 19hC6

Dear Sirs:

Although no specific reporting recuirements have been dete._ined, this letter

~

is to infor: 'you that certain TMI-1 Pre-Service Inspection Baseline Dat:

records have been tisplace:1. This situation was first discovered in March, 1975 and cinee that time a rather extensive ir.vestigation has been conducted

'";to recover the missing data.

Physical searches have unfortunately failed to produce the rajority of the required decurents.

A detailed lis;ing of the nissing data is provided in Attach =ent 1 together with the action ve intend to take in each case of missing data.

You vill note that in sc:e cases ve vill n6t re-establich the missing baseline data while in othere the baseline data vill be re-established cither during the 197o refueling outage or over the forthec=ing 10 year period. The justification for this position is that Met-Ed has, er vill i

shortly receive, copics of the construction recer:Is for all cases of cissirs data. These recorde vill serve to verify that the original velds or components were cound.

In addition, for the : jority of cases of n.issing beceline data, the Pre-Exc=ination Final Repo-t (?O) indicates that baseline data was taken and revieveC appropriately and no defects vere indicated.

For the canes of =iscing data for which no dec"-6 ' ' ion exists to verify that b.'.: cline data was tr. ken, cnd for which the bnscline vill not be re-established, it in felt that the existence of the construction records alene provides adequnte assurcnce es to the integrity of the componente involved and the required pre-scrvice inspecticn baccline tects concatially duplicate the cacactic particle construction tests certified by the nanufacturer.

Furthernere, vc arc certain ths.t be.:pline data uns taken cs rc0 ult of the previous?.y mentioned investig. tion d.nd the fact that on at lennt tuo occuuions before the data was discovered miccing, the Baseline Data recorde vere infor-nlly audited and inventoric.1 with no dicerepanc$ c reported.

46 r!52

~~'

7910160

-g-

\\

As prc.'icucly ste.ted, no.or=al reporting requirenent ex.ats for Pre-Service Inspection Data, hovover we are providing this information in accordance vith our policy cf openness on all, issues, and hopefully to answer any future concerns you =ay have.

Sincerely, f

]

/ %dr r

t l1. C. Arbold Vice President RCA:Cn'S :11:

File:

20.1.1/7 7.4.13.1 Attach =ent m

e

?00RORGNAL i

~

1446 053 g

I i

i.

I 4

1s O

r.-- - -,,-

'tas% L ($3 -

~'

ATTI.Cl!E NT 1

/1..,w.n e. 9 g ?/ $lW

!!UTES TO ACC0!?ANY TABIR ACTION COMPONENT TEST COUSTRUCTE) PROPERLY BASELIiTE TAKEN ACTION JUSTIFICATION P

'R C0!TO:!ETC3 AND THE TYPES OF EXISTING SPECIFIC EXIS*.'ING 8PICIFIC ACTION T!!AT WILL Si JITIC SUB--COMPGNEHTS TEST DATA THAT DOCU'TS1TATION OR Doctr'I!tTATION OR BR TAKEN DURING JUSTIFICATION ARE LISTED TOR ITDG ARE MICSING RECORD 3 TitAT SUPPORT-REcoitD3 T: TAT JAH-MAR' 76 'N)

FOR Ti!E ACTION FC' T.IICH BASELINE ARR LISTED THE FACT TIIA*J W:LD EUPPORT Ti!E FACT REESTADLISH BASE-SPECIFIED IN THE DA.. ARE MISSING OR CO:OCUErs? WAS THAT ISI BAS}1INE LINE DATA.

IN-ADJACEliT C0! MCI.

IMDE AND OR COL DATA VERE TAYEN DICATE WITH A

  • IF AN ITD4 VILL STRUCTED PROPERLY.

AND RISULTS VCR3 THOSE ITINS NOT DE ACT2D Ort D

BATISTACTORY IN UllICII VILL ALSO BE IN JAN PUT VILL O

ACCORDAllCE WIT)!

INSPIETED PER ISI BE AT A IATER M

ASME BOILER AND TECi!. 8PECS. (NOIR: RERJELING--

PRESSURE VESSEL INDICATE WITH A ** Ti!E 1.ATP.R REf1JEL.

O CODE SIX: TION XI T!!OSE ITD43 WHICH ING DATE, EE N

AR9 HANDATORY ISI ACTION 'I1 TAT VILL g

ITDG FOR JAN.876 LE TAKEN AND Tjg RERJELING.

JUSTIFICATION Z

FOR TRIS AcrION D

ARE SPECIFIID F"""

AB3 REVIA ~' IONS:

UT ULTRASONIC TEST MP KAGNLTIC PARTICLE TEST gj

-.s kV LP LIQUID PENETRA!fr CEST s

IN Q PIFR PRESERVICE EKAMINATION FINAL REPORT yu *I O

yN D' Ln

~

..c

/

~l/ s/

n al n.la rt.i.e'.;'.;;/.!

'#"'" 7 '! ' ' '

  1. dd, t',

f nielnon snijf scalIUN 1

Reactor Vessel UT Radiograph-copy of radio-PEFR none Construction recoros and PEFR indi,

l X~licad to graph requested froin BW tlDT examination cate that there were no flaws and flanga weld RH-001-C sumary table 1 that the temelinewas taken. The i

page 2 reported baseline will be re-established by no indications accetplishing the rents over the nex.. tech. spec. require-of flaws.

t 10 years. Tecli. 'I i

specs. require UT of 1/3 of the weld

/ every 3 1/3 years. UT of 1/3 of the weld will be perforr.ed in January '76.

y i B. CR0 Pressure UT Radiograph-copy of radio-PEFR none Construction records and PEFR indicate 6.ousing graph requested from B W

!;DT exam sumary that there were no flaws ar.d that j

.;alds table 1 pages 12 the baseline was taken.

. CI'D-001-C to

"*CJ thru 20. Report.

The baseline.wl.11 be re-( CRO-207-C C:D ed no indica-establii:hed on 5 CR0s~ by acco:cplish-i (207 welds)

C"")

tions of flaws.

lag the tech. spec. requiredents over J

PC3

!)

the next ten years.

It is felt'there is no technical justification for re-l C"")

establishing the baseline for 69

{

lll:C3 CR0s since only 5 are required to g

be examined on a periodic basis.

1 Tech, specs require UT of'5 CRDs every r;

Z 10 years. (!!0TE sarre 5 will be re-3ll:m inspected for 40 years)

F UT of Welds _in CR0 (15 during,,76

~~

CRD #44 during 77 or,78

. CR0 #60 du'. ing,'5 79 or'80 L

CR0 #03 during 82 CRD, #32 during,83.or 84 L-0 O

M e

A h

CN I

a I

O w

l of 6 l

CCN ONEriT TEST C0!!STRUCTED PROPERLY DASElli!E TAKEli ACTION ACTIO:1JUSTIFICATI0tt C. Vcssal closure I.P LP PEFR None Construction records and PEFR indbite head cladding DS'.. letter dated 8/25/70 NDT exam sumary that there were no flaws and that the Ril-001-CL to certifics HT. Vernon table 1 pages baseline was taken. The baseline -

RH-005-CL shop conducted LP per 38 and 39 will be re-established by accomplish-

-(6 patches of section III of the ASME -

reported no ing the tech. spec. rcquirements over cladding 6" x,6")

coda 1965 Ed. including indications of -

the next 10 years. Tech. specs.

up thru tho '67 sunn:er flaws require LP of 2 patches every 3 1/3 summer addondum years. LP of 2 patches will be per-formed in January '76.

Pressur*'zer A. u,,pc primsry Manway Studs -

PRm-01-H to HP MP PEFR

  • MP or UT Baseline will be re-established in PRm-12-H Het-Ed has construction NDT exam and visual Jan. '76 during performance of the records which indicate MP sun: nary table I ter;h. spec. requirements test was done and no page 46 reported flaws were discovered no indications of flaws

!{uts PRm-01-Q to HP HP I;o documentation

  • llP or Baseline will be re-established in PR.-12-Q Met-Ed has construction exists to support UT and Jan. '76 during perfo17.hnce of the records which indicate MP the fact that this visual tech. spec, requirementz test was done and no test was accom-1 flaws were discovered plished during the baseline inspection.

R, Lotter MP HP PEFR None Construction records a PETR indicate heiter bundle Met-Ed has construction liDT cxam sumary that there t,<cre no flaws and that studs records which indicate table 1 page 43 the baseline was taken. Tech. specs Palb-01-H to HP test was done and no reported no require only visual examinations be PRHa-16-!1 flan were discovered indications of flaws performed for the inservice inspec '

Z tions during '76 or '77 -

s

]

~

p_.er c, w

o j. 3, j

i y.

( -

N'ata PElb-01-Q NP MP No documentation None

,Cor:struction records verify that "

to PTJu-16-Q Met-Ed has construction exists to support HP t?st was accomplished and records which indicate the fact that this nofiswst:: rediscovered. Tech.shes HP test was done and no test was require only visual exminaticns be flaws were discovered acco:nplished during perforn:ed for the inservice the baseline insp.

Inspections during '76 o' '77 r

C. Hiddle heater bundla StMs. PFJ1b-01-H HP MP PEFR None Construction records and PEFR indicate tt 1Hb-16-H Hot-Ed has construction HDT exam sunrnary that there were no flaws and that the records which indicate table 1 page 45 baseline was taken. Tech. Specs MP test was done and no reported no require only visual examinations flaws were discovered indications of be perforced for the inservice flaws inspections during '78, '79 or '80 Nutv. FRHb-01-Q HP MP No documentation None Construction records verify that the to FRHb-1G-Q Met-Ed has construction.

exists to support MP test was accomplished and no records which indicate the fact that this flaws were discovered. Tech. specs.

HP test was done and test was accom-require only visvil examinations be no flaws ware plished during the-performed for the inservice discovered baseline insp, inspections during '78, '79 or 80 s

0 r!pper henter HP MP PEFR None Construction records & PEFR indicate b

lo studs Mot-Ed has construction KDT exam summary that there were no flaws and that PRHc 01-M records which indicate table 1 page 44 the baseline was token. The baseline to ?'4b-16-H HP test was done and reported no will be re-established by accc:plish-no. flaws were '

indications of ing the tech spec requirce:nts over discovered flaws thenext10 years.Techspqcs e::utre HP or UT and visual during 81.(82. 'A' or%4 5

a U

3 o!.!

i

}

C0"Pt1NFHT TEST CONSTRUCTED PROPERLY-BASELINE TAKEN ACTION ACTIDH JUSTIFICATION

/

Huts HP MP No documentation None PRHe-01-Q Met-Ed has construction exists to support Constructien records verify that to PRHc Q records which indicate the fact that flaws were discovered.

The base-the MP test was accomplished and no' i

HP test was done and this test was i

line will be re-established by no flaws were discovered accomplished dur-ing the baseline accomplishing the tech. spec. require inspection ments over the next 10 years. Tech.

specs require HP or UT and visual 1

l<

during'81.'82.'83 and'04

,, E, Pressurizer UT Radiograph copy of radio.

PEFR None Construction records and PEFR fndicat j

'e Relief Viv graph requested from NOT exam sumary that there were no flaws and that the 11 Loop Seal Piping UE&C table 1 page 66 baseline was taken. Per proposed tech i velds PR-030 to

'"O reported no C

indicationsof flaws spec change to be submitted--the

.)Pa-C45(16 welds)

C"3 baseline data will be re-established

..,)

lllRlll3 on the most highly stressed weld in 4

the loop seal to the 1A code safety valve. It is envisioned that this UT

,c lll:'tl3 baseline on weld PR-033 will be accomplished during the next 10 g

years, The existing technical

'b specifications under piping circum-Z

?}

3:::=

ferential and longitudinal reactor coolant systems welds have not listed

==""

PR-033. This will be corrected as

)

co frdicatedabovebyatech. spec.

change. UT during 81 '82,'83 or'84.

hj_tcanGenera-a 12f8 i!A.NozzlaWelds UT Radiograph

  • PEFR None Construction records & PEFR indicate j SG-002-H to copy of radio-NDT exam sumary that there were no flaws and that

. SG-004-N and graph requested table 1 page 50 the baseline was taken. It is felt

]Sfi-~010-N SGe003-N to fro:n 8&W

~

reported no there is no technical justification 3

indications of flaws for re-establishing the baseline since tech, specs require no

, ~ " * * * * '

further inspection n..

4#6 s

\\

,, u,. i.

3

o. rrwary rhd nr r#

PEFR None Construction records and PEFR indicata Marxay Studs Met-Ed has construction NDT exam sumary that there were no flaws and that the SGa-01-M to records which indicate table 1 page 89 baseline was taken. The baseline will l

SGa-16-M MP test was done and no reported no be re-established by accomplishing i

flaws were discovered indications of

.the tech, spec. requircrents over the d

flaws 3next10 years. Tech, specs require HI

' or UT and visual during '81,'82. '83 or

%4.

l 1 wa-17-M MP HP PEFR None Construction records and PEFR indicate to SGa-32-H Het-Ed has construction NDT exact sumary that there were no flaws and that the records which indicate table 1 pages 89 baseline was taken. Tech. specs MP test was done and no and 90 reported no require only visual examinations be flows were discovered indications of flaws perferqed for the inservice inspectior.

during 78.'79 or'80.

1 i SGb-01-H MP MP PEFR None Construction records and PEFR indicate i to SGb-32-M Met-Ed has construction HDT exam sumary that there were no flaws and that I

records which indicate table 1 pages 90 the baseline was taken. Tech. Specs MP test was done and no and 91 reported require only visual examinations be flaws were discovered no indications of performed fo(76 or'77.the inservice insp i

flaws tions during l

] NutsSGa-01-Q MP HP, No documentation None Construction records verify that the t' SGa-16-Q Het-Ed has construction cxists to support MP test was acco:'plished and no flaws 1

T records which indicate the fact that the were discovered. The baseline will

~

D I

~

D flaws were discovered plished during the the tech. spec. requircvents over the MP test was done and no test was accom-be re-established by accomplishing l

2 baseline insp.

next 10 years. Tech. Specs re HP or UT and visual during'81.yequ{83 i

z_:.

82, I

D or '84.

s

_M S of 6

}

u

)

w g

? "i

.a Q tn

."2 :::=

.o r--

84

COMPONElli TEST CO:ISTr.UCTED PROPERLY BASELINE TAKEN ACTION ACTION JUSTIFICATION l.

S3a-17-Q HP HP No documentation None Construction records verf fy that the to SGa-32-Q Mot-Ed has construction exists to support MP test was accomplished and no fl'aws records which indicato the fact that 'the were discovered. Tech, specs require MP test was done and no test was accomp-only visual examinations be performed flaws woro discovered lished during the for the inservi:e inspections during baseline insp. -

'78, '79 or '80.

SGb-01-Q HP MP No documentation None Construction records verify that.the tt Ob-32-Q Met-Ed has construction exists to support MP test was accomplished and no flaws records which indicate the fact that the were discovered. Tech specs require HP test was done and no test was accom-only visual examinations be performed flaws were discovered plished during wr the inservice inspections during the baseline

'76 or'77.

insp.

Pining Velds UT Radiograph

  • 'C3 PEFR None Construction records and PEFR fndicate E Nakeup &

copy of radiograph CD flDT exam sumary that there were no flaws and that Purification requested from UE&C C"3 table 1 page 84 the baseline was taken. Met-Ed will' KJ-2E7 to M

reported no indi-EU-271 per present tech. specs inspect the cations of flaws aisc high pressure injection line wcld (F

elds)

C"3 Co un letter co-that is under the highest stress in g pressure 2

signed by an auth-during'76 or'77. (Note: Weld with inh tion g"""""'

orized code higheststressisHU-167) li.

with inspector dated HU-V16A 2

1-28-74 Indicates 3:=

baseline data was taken.

Decay Heat UT Radiograph PEFR None Construction records and PEFR indicate Sys'te:a Copy of radiograph NOT exam sumary that there were no flaws and that the DH-056 requested from table 1 page 6G baseline was taken. Met-Ed will per

^

UE&C reported no present tech, specs inspect the indications of flaw:

decay heat outlet line wcld that is under the highest stress during 78, ca

'79, or'80. (Note: Weld with highest stressisDN-005) co a,'

,