ML19256B756

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-21, Temp Effects on Level Measurements. No Action Required
ML19256B756
Person / Time
Site: Limerick  
Issue date: 08/13/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 7908280318
Download: ML19256B756 (1)


Text

'

'pa "'cw y

[

UNITED STATES y y, r.c g

NUCLEAR REGULATORY COMMISSION 3 g ',

E REGION I S ' f$

g 631 PARK AVENUE

,6 KING OF PRUSSIA, PENNSYLVANIA 19406

' t e' Docket Nos. 50-352 fgy3;g 50-353 Philadelphia Electric Company ATTN:

Mr. V. S. Boyer Vice President Engineering and Research 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

The enclosed Bulletin 79-21 is forwarded to yot for information.

No written response is required.

If you desire additional infonnation regarding this matter, please contact this office.

Sincerely, lh I

A Boyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 79-21 2.

List of IE Bulletins issued in the Last 6 Months 79082803)8

i ENCLOSURE 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 79-21 Date:

August 13, 1979 Page 1 of 2 TEMPERATURE EFFECTS ON LEVEL MEASUREMENTS Description of Circumstances:

On June 22, 1979, Westinghoum Electric Corporation reported, to NRC, a potential substantial safety hazard unter 10 CFR 21.

The report, Attachment No.1, addresses the ef fect of increased containment temperature on the reference leg water column and the resultant effect on the indicated steam generator water level.

This effect would cause the indicated steam generator level to be higher than the actual level and could delay or prevent protection signals and could, also, provide erroneous information during post-accident monitoring.

Attachment No. 1 addresses only a Westinghouse steam generator reference leg water column; however, safety related liquid level measuring systems utilized on other steam generators and reactor coolant systems could be affected in a similar manner Actions To Be Taken By Licensees:

For all pressurized water power reactor facilities with an operating license:*

1.

Review the liquid level measuring system; within containment to determine if the signals are used to initiate safety actions or are used to provide post-accident monitoring information.

Provide a description of systems that are so employed; a description of the type of reference leg shall be included, i.e., open column or sealed reference leg.

2.

On those systems described in Item 1 above, evaluate the effect of post-ac-cident ambient temperatures on the indicated water level to determine any change in indicated level relative to actual water level.

This evaluation must include other sources of error including the effects of varying fluid pressure and flashing of reference leg to steam on the water level measure-ments. The results of this evaluation should be presented in a tabular form similar to Tables 1 and 2 of Attachment 1.

DUPLICATE DOCUMENT Totting water reactors have been requ Entire document previously NRC to provide similar information, ntered into system under:

ANO h

h/

No. of pages: [2