Forwards IE Bulletin 79-18, Audibility Problems Encountered on Evacuation of Personnel from High Noise Areas. No Action Required
ML19256B709
Person / Time
Site: Beaver Valley
Issue date: 08/07/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
References
NUDOCS 7908280074
Download: ML19256B709 (1)


Text

%

paa'%

IM y,

?,

UNITED STATES y,,

c (,;

NUCLEAR REGULATORY COMMISSION 3 _( }AlJ_. j REGION l S fg g

631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19s'

"~#

AUG 0 71373 Docket No. 50-412 Duquesne Light Company ATTN:

Mr. E. J. Woolever Vice President 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Gentlemen:

The enclosed Bulletin No. 79-18 is forsarded to you for information. No written response is required. If you desire additional information regarding this matter, please contact this office.

Sincerely, k

W Boyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 79-18 2.

Listing of IE Bulletins Issued in Last 6 Months cc w/encls:

R. J. Washabaugh, Quality Assurance Manager 790828m'i

~

ENCLOSURE 1 UNITED STATES NUCLE / R REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 79-18 Date:

August 7, 1979 Page 1 of 2 AUDIBILITY PROBLEMS ENCOUNTERED ON EVACUATION OF PERSONNEL FROM HIGH-NCISE AREAS Description of Circumstances:

In January 1979, a number of licensee personnel were engaged in routine activi-ties in the auxiliary building at the Florida Power Corporation, Crystal River Unit 3 nuclear plant.

While these individuals were working in the auxiliary building, in a high-noise (fan) area, an unplanned release of radioactive noble gases was detected by building monitors within the auxiliary building at concentrations which caused the licensee to initiate the facility emergency plan auxiliary building evacuation procedure.

The facility Emergency Officer (Shift Supervisor) assessed the monitor readings and initiated an auxiliary building evacuation.

The evacuation announcement, made over the licensee's PA system, was not heard by the personnel working in the high-noise area.

Licensee personnel did evacuate the auxiliary building upon observing that other personnel had left, and after calling the control room to inquire if an evacuation had been initiated.

During these occurrences, licensee personnel were not exposed to quantities of radionuclides above regulatory guidance.

However, the potential existed for inadvertent unnecessary exposure of individuals to radioactive materials.

Subsequent to the NRC followup inspection o' this occtrrence, Florida Power Corporation initiated an assessment of this situation and performed an engineering evaluation anC identified several plant areas where the annunciator system needed audibility improvement.

The licensee has installed a new auxiliary building evacuation tone signal and may add visual alarm indicators in areas of very high-noise.

Action to be Taken by the Licensees:

For all power reactor facilities with an operating license:

1.

Determine whether current alarm systems and evacuation announcement systems are clearly audible or visible throughout all plant areas with emphasis on high-noise areas.

Determination in high noise areas must be made with the maximum antici ated noise level DUPLICATE DOCUMENT Entire document previously entered into system under:

ANO 7 9 d 9 O J C 4 O ~$

No. of paces: