ML19256A992
| ML19256A992 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/28/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Barton A ALABAMA POWER CO. |
| Shared Package | |
| ML19256A982 | List: |
| References | |
| NUDOCS 7901170369 | |
| Download: ML19256A992 (2) | |
See also: IR 05000364/1978017
Text
.
'e.
.
UNITED STATES
[g >* 88 %
NUCLEAR REGULATORY COMMISSION
og
O
e
REGloN il
y,
I
" '
E
101 M ARIETT A sTRE ET. N W.
[
ATLANTA GEoRGt A 30303
%
/
- "*
NOV 2 8197B
In Reply Refer To:
RII:BRC
50-364/78-17
Alabama Power Company
ATTN:
Mr. A. R. Barton
Executive Vice President
-
Post Office Box 2641
-
Birmingham, Alabama 35291
Gentlemen:
This refers to the inspection conducted by Mr. B. R. Crowley of this office
on October 24-27, 1978, of activities authorized by NRC Construction Permit
No. CPPR-86 for the Joseph M.
Farley Plant, Unit 2 facility, and to the
discussion of our findings held with Mr. R. E. Hollands at the conclusion of
the inspect. ion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representetive records, interviews
with personnel, and observations by the inspectors.
During the it.:pection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These items and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations. Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken
by you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the ndC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of_this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document. If we do not bear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
7901176369
.
,
NOV 2 8 E78
Alabama Power Company
-2-
Should you btve any questions concerning this matter we will be happy to
discuss them with you.
Sincere 1y,
'Ns' L
(
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures.:
1.
Appendix A, Notice ,< Violation
2.
Inspection Report Nr. 50-3e4/78-17
cc w/ encl:
Mr. R. E. Hollands, Jr., QA Supervisor
P. O. Box U
Ashford, Alabama 36312
.