LER 78-34/03L-0 781213:both Diesel Generator & Station Batteries Were Not Tested & Monitored within Specified Time Interval.Caused by Failure to Adhere to Surveillance Schedule
ML19256A822
Person / Time
Site: Oyster Creek
Issue date: 01/09/1979
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19256A821 List:
References
LER-78-034-03L, LER-78-34-3L, NUDOCS 7901160206
Download: ML19256A822 (3)


Text

{{#Wiki_filter:7 77)

          .           .                                                         LICENSEE EVENT REPORT
        ,        CONTROL BLOC #(- l                  l      l      l    l   l       l                    (PLEASE PRINT OR TYPE ALL REoVIRED INFORMATION) i                                     e o i1        lNlJl0lClPl1l@l0                                          0 l- l 0 l0 l 0 l 0 l 0 l- 10 l 0 l@l4 l1 l1 l1l1l@l57 CAT 25      26     LICENSE TYPE JO l

58 l@ 8 9 LICENSEE CCDE 14 16 LICENSE NuvbkN CON'T of1 ",y 3g l L j@l 015 l 0 l 010 l 2 l 1 l 9 }@l 1 12 l 1 l 3 l 7 l 874}@l0 po; AET NUVBEF 68 69 EVENT D ATE 75 l 1REPORT l 0 l CATE 9 l 7 l 980 l@ 8 00 61 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h j O 2 1 Durino normal operation, while reviewing surveillance procedures, it was o 3 1 discovered that both the diesel generator and station batteries were not l Safety signifi-Lo_Ja I tested and monitored within the specified time interval. j o s I cance of this event is considered minimal since recent tests of both o e I systems Indicated all parameters were acceptable. l 017 l l 0181 I 80 7 8 9 COYP- VALVE SYSTEV CAUSE CAUSE COCE SUBCODE CO**PCNENT CODE SUECOOE SU6COCE CCDE O19 lE l DI@ l Al@ l B l@ lZ lZ lZ lZ IZ IZ l@ l Z l@ [_Zj 19 20 7 6 9 10 11 12 '2 16 000er2ENCE REFORT R E VISION

                                                                                  'E QUENTI AL EVENT YE AR                                   REPORT NO.                             CCDE              TYPE                         N O.
               @ , Ly.jESE F. R 1      C7181                    1-1            ! O 1314 I                 l/l          10 13 l              [Ll             l-l        10 l 24             26          27           CE        29         30              31         32

_ 21 22 23 HOURS 22 Sei FORi B. S PPLI MA' FACTURER TA A O ON PLANT ETH l H l@[p@ lZl@ l2l@ l010l0l0l y@ lY lg lZ ]@ lZl9l9l9l@ 44 47 23 34 35 x 2 42 4: 42 43 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h j 1 o1 The cause of the occurrence can be attributed to +he failure to adhere [T l il l to the surveillance schedule. This occurred due to the heavy work load i i , I durinc the refuelina outage. The electrical suoervisor will instruct l P 13 l

                              .his Dersonnel on the importance of performing the recui red surveillance                                                                                  j i   4       l test within the time frame outlined in the Tech Specs.

g3 7 8 9 F ACILITY UETHOD C3

                                    % POWE R                          CTHER ST ATUS                DISCOV E S Y                         DISCOVERY DE%CRiPTION STATUS

[Al@l Review of Surveillance Procedure l i 5 lE l@ l 0 9 9l@l NA l ACTIVITY CONTENT AYOUNT OF ACTIVITV' LOCATION OF RELE ASE RELEASED OF RELE ASE NA UA l i 6 Z l @ l Z j@l 44 l l 45 go 7 8 9 10 11 PERSONNEL EXPOSU9ES NUYBE R TYPE DESCRIPTION NA l i 7 l 0 10 l 0 l@l Z l@l PERSONNE L INJURIES NuveER oESCRiPtiON@ 1 - [0 l0 0 @L NA, go l 8 9 12

                                                                                                                             '774/M M 7                                 11 LOSS 08 OR D AMAGE TO F ACILtTV
  ,   O e 9 iTjgi "" " 10 N,

30 i 7

r iSSUEf@

lY l 10 DESCRIPTION Weekly press release - January 16, 1979 l 68 69 lllt lllll1ll lf 6 3. ;; 7 P S '

                                                                                    . ss                                          PHONE.                                                 ,

N A*.* E O F P R E P A R E R

 - w w .a m :--.      -             =

Jersey Central Power & Light Company df(-)'.).,L as _ a [c a_+' -{r . J

                                        ,                                            uee,scn ^ venue at eunen sowi sceu A                                                   Morristown, New Jersey 07960 (201)455-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licensee Event Report Reportable Occurrence No. 50-219/78-34/3L-0 Report Date January 9, 1979 Occurrence Date December 13, 1979 Identification of Occurrence Violation of the Technical Specifications, paragraph 4.7. A.5 and 4.7.B.1 when the diesel generator and station batteries were not tested and monitored within the specified time interval.                  This event is considered to be a reportable occurrence as defined in the Technical Specifications, pa ragraph 6.9.2.b.3 Conditions Prior to Occurrence The major plant parameters at the tima of the occurrence were:

Power: Generator, 665 MWe Reactor, 1919.2 MWt Flow: Recirculating, 16.0 x 104 gpm Feedwater, 7.165 x 106 lb/hr Stack Gas: 4.46 x 104 pC1/sec. Description of Occurrence On Wednes. day, December 13, 1978, at approximately 1100 hours, during review of the surveillaice procedures by the reviewing engineer, it was discovered that both the diesel generator and station batteries were not tested and monitored within the specified time interval. The following dates and intervals were found to exist for those tests that were delinquent. Recent Previous interval Station Battery "A" 12/4/78 11/18/78 16 days Station Battery "B" 12/4/78 11/18/78 16 days Diesel Generator Battery #1 12/5/78 11/18/78 17 days Diesel Generator Battery #2 12/5/78 11/18/78 17 days Jersey Central Power & Light Company ;s a Member of the Genera: Pumc Utit.es System

 .   ,=

Reportable Occurrence No. 50-219/78-34/3L-0 Page 2 January 9, 1979 Apparent Cause of Occurrence The apparent cause of the occurrence can be attributed to the failure to adhere to the distributed surveillance schedule. This occurred due to the heavy work load during the refueling outage. Analysis of Occurrence The station battery has been sized with a capacity suitable to supply emergency power for a time deemed adequate to safeguard the plant while normal sources of power are restored. The diesel generator batteries have been sized with a capacity suitable to start the diesel generators in case of a loss of power accident. The recent surveillance of both diesel and station batteries indicated that all param'.ters were acceptable,and had the system been called upon, it would have functioned satisfactorily. Corrective Action The instrument and Electrical Maintenance Supervisor was notified that the diesel and station batteries weekly surveillance was overdue. The Plant Operations Review Committee (PORC) discussed this problem with instrument / electrical supervision. The instrument / electrical supervisor will instruct his personnel on the importance of performing the required surveillance test within the time frame outlined in the Technical Specifications. The PORC also reviewed the electrical department's system for scheduling the required tests and was satisfied with its operation. Failure Data Similar event occurred in Reportable Occurrence No. 50-219/78-08/3L-0.}}