ML19256A593

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 780925-28
ML19256A593
Person / Time
Site: 07000754
Issue date: 11/02/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19256A592 List:
References
70-0754-78-09, 70-754-78-9, NUDOCS 7901090068
Download: ML19256A593 (1)


Text

-

APPENDIX A General Electric Company Vallecitos Nuclear Center Pleasanton, California 94566 Docket No.70-754 License No. SNM-960 Notice of Deviation Based on results of the NRC inspection conducted during the period September 25-28, 1978, it appears that one of your activities was not conducted according to generally accepted practices and proce-dures in the industry as indicated below:

Contrary to generally accepted procedures, the licensee's air alpha sampling and counting procedures presently require 4 to 6 days before results can be reported to the Radiation Protec-tion Function for their information and action. That period compares with 24 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> generally attainable in the industry.

This is a deviation.

790'000063