Text
S.
.
[g8 "f Gg (o,,
NUCLEAR REGULATORY COMMISSION
UNITED STATES
'
o
R EGloN 11
2
3 7,g
$
101 M ARIETTA STREET. N.W.
0
i
o,
[
ATLANTA, GEORGIA 30303
%,
/
OCT 181978
- ..*
In Reply Refer To:
RII:FSC
50-321/78-32
50-366/78-40
Georgia Power Company
Attn:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N. W.
Atlanta, Georgia
30303
Gentlemen:
This refers to the inspection conducted by Mr. F. S. Cantrell of this
office on September 13-15, 1978, of activities authorized by NRC Operating
License No. DPR-57 and License No. NPF-5 for the E. I. Hatch Units 1 and 2
facilities, and to the discussion of our findings held with Mr. M. Manry
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously
identified enforcement matters. These are discussed in the enclosed
inspection report.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report. These items will be examined during subsequent
inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that ,ou (or
o n , , .' s O @GQ
.
.
.
'
007 1 8 9979
,
Georgia Power Company
-2-
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
)?. c:.
F. J.
ong, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report Nos.
50-321/78-32 and 50-366/78-40
cc w/ encl:
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I; Hatch
P. O. Box 442
Baxley, Georgia 31513
Mr. M. Manry, Plant Manager
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
Mr. K. M. Gillespie
Construction Project Manager
Plant E. I. Hatch
P. O. Box 439
Baxley, Georgia 31513