Forwards IE Inspec Repts 50-321/78-32 & 50-366/78-40 on 780913-15 During Which No Items of Noncompliance Were Noted
ML19256A259
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/18/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19256A258 List:
References
NUDOCS 7811280008
Download: ML19256A259 (2)


See also: IR 05000321/1978032

Text

S.

.

[g8 "f Gg (o,,

NUCLEAR REGULATORY COMMISSION

UNITED STATES

'

o

R EGloN 11

2

3 7,g

$

101 M ARIETTA STREET. N.W.

0

i

o,

[

ATLANTA, GEORGIA 30303

%,

/

OCT 181978

    • ..*

In Reply Refer To:

RII:FSC

50-321/78-32

50-366/78-40

Georgia Power Company

Attn:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N. W.

Atlanta, Georgia

30303

Gentlemen:

This refers to the inspection conducted by Mr. F. S. Cantrell of this

office on September 13-15, 1978, of activities authorized by NRC Operating

License No. DPR-57 and License No. NPF-5 for the E. I. Hatch Units 1 and 2

facilities, and to the discussion of our findings held with Mr. M. Manry

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously

identified enforcement matters. These are discussed in the enclosed

inspection report.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report. These items will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that ,ou (or

o n , , .' s O @GQ

.

.

.

'

007 1 8 9979

,

Georgia Power Company

-2-

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

)?. c:.

F. J.

ong, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report Nos.

50-321/78-32 and 50-366/78-40

cc w/ encl:

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I; Hatch

P. O. Box 442

Baxley, Georgia 31513

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

Mr. K. M. Gillespie

Construction Project Manager

Plant E. I. Hatch

P. O. Box 439

Baxley, Georgia 31513