[ p ,PFot,
UNITED STATES
.
, -]
'o
NUCLEAR REGULATORY COMMISSION
- -
[ .
Y
n
REGION IV
-
E
611 RYAN PLAZA DRIVE, SUITE 1000
- ' ' s
[
%'
/
September 22, 1978
In Reply Refer To:
RIV
Docket No. 50-466/Rpt. 78-02
Houston Lighting and Power Company
,
ATTN: Mr. E. A. Turner, Vice President
Power Plant Construction and
Technical Services
Post Office Box 1700
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Messrs. W. A. Crossman, W. G.
Hubacek and J. I. Tapia of our staff during the period August 16 and
Augtst 29 through September 1,1978, of the implementation of your quality
assurance program for construction activities related to your application
for a construction permit for Allens Creek Nuclear Generating Station,
Unit No.1, and to the discussion with Mr. R. A. Frazar and other members
of your staff at the conclusion of the inspection.
Areas exanined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records., inter-
views with personnel, and observations by the inspectors.
During the inspection, it was found that certain of your activities appeared
to deviate from commitments in the PSAR. The items and references to the
specific commitments are identified in the enclosed Notice of Deviation.
Please provide us within 30 days, in writing, with your comments concerning
the items, a description of any steps that have beer, or will be taken to
correct them, a description of any steps that have been or will be taken
to prevent recurrence, and the date all corrective 2.ctions or preventive
measures were or will be completed.
One new iinresolved item is identified in paragraph 6 of the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
7612.03 00(
.
Houston Lighting and Pcwer
Company
-2-
September 22, 1978
proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure.
The application
must include a full statement of the reasons why it is claimed that the
information is proprietary.
The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
.
/"
b
W. C. Seid
, Chief
Reactor Co struction and '
Engineering Support Branch
Enclosures:
1.
Appendix A, flotice of Deviation
2.
IE Inspection Report No. 50-466/78-02
.