Forwards IE Insp Rept 50-327/79-47 on 790905-07.No Noncompliance Noted
ML19254F157
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/26/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19254F159 List:
References
NUDOCS 7911070220
Download: ML19254F157 (2)


See also: IR 05000327/1979047

Text

D

/

!

o,'n

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

3

I

REGION 11

i

e'['

o,

101 M .RIETTA sT,. N.W., sulTE 3100

ATLANTA, GEORGIA 3o3o3

In Reply Refer To:

SEP 2 61979

RII: GAB

50-327/79-47

-

.

Tennessee Valley Authority

Atta:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by G. A. Belisle of this office on

September 5-7, 197c of activities authorized by NRC Construction Permit No.

CPPR-72 for the Sequoyah facility, and to the discussion of ca findings held

with J. M. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Pub 1:1 Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is clained that the information is proprietary, and should be prepared so

that prop ietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

~

I?88 B:

7911070 M A O

^

'

.

.

',

Tennessee Valley Authority

-2-

SEP 2 61979

Should you have any ques 'ons concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-

64 %

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-327/7c-47

cc w/ enclosure:

G. G. Stack, Project Manager

Fost Office Box 2000

Daisy, Tennessee 37319

J. F. Ballentine

Plant Superintendent

Post Office Box 2000

Daisy, Tennessee 37319

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, Tennessee

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

1288 23~

/

e

e