ML19254F157
| ML19254F157 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/26/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19254F159 | List: |
| References | |
| NUDOCS 7911070220 | |
| Download: ML19254F157 (2) | |
See also: IR 05000327/1979047
Text
D
/
!
o,'n
UNITED STATES
NUCLEAR REGULATORY COMMISSION
,
3
I
REGION 11
i
e'['
o,
101 M .RIETTA sT,. N.W., sulTE 3100
ATLANTA, GEORGIA 3o3o3
In Reply Refer To:
SEP 2 61979
RII: GAB
50-327/79-47
-
.
Tennessee Valley Authority
Atta:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by G. A. Belisle of this office on
September 5-7, 197c of activities authorized by NRC Construction Permit No.
CPPR-72 for the Sequoyah facility, and to the discussion of ca findings held
with J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Pub 1:1 Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is clained that the information is proprietary, and should be prepared so
that prop ietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
~
I?88 B:
7911070 M A O
^
'
.
.
',
Tennessee Valley Authority
-2-
SEP 2 61979
Should you have any ques 'ons concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
64 %
R. C. Lewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No. 50-327/7c-47
cc w/ enclosure:
G. G. Stack, Project Manager
Fost Office Box 2000
Daisy, Tennessee 37319
J. F. Ballentine
Plant Superintendent
Post Office Box 2000
Daisy, Tennessee 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
1288 23~
/
e
e