Requests Util Reconsider Position on Inservice Insp (ISI) Requirements of 10CFR50 for ASME Code Class 1-3 Components & Provide ISI Program for Unit 1 within 60 Days
ML19254E957
Person / Time
Site: Calvert Cliffs 
Issue date: 10/24/1979
From: Reid R
Office of Nuclear Reactor Regulation
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 7911050111
Download: ML19254E957 (2)


Text

^ *d j

,(pa arog,k UNITED STATES

,., (

g NUCLEAR REGULATORY COMMISSION y

E C SHINGTON, D. C. 20555

,/

October 24, 1979

[)ocEdtNo.50-317 Mr. A. E. Lundvall, Jr.

Vice President Supply Baltimore Gas & Electric Company P. O. Box 1475 Baltimore, Maryland 21203

Dear Mr. Lundvall:

In recent discussions with your staff, we were informed that the Inservice Inspection (ISI) requirements of 10 CFR 50, Part 50.55a(g) for ASME Code Class 1, & and 3 conponents can be met at Calvert Cliffs Unit No.1.

We were further informed that:

1.

The next 40-month ISI program, correncing on September 8,1978, has been prepared in accordance with 10 CFR 50.55a(g)(5)(i);

2.

No known conflicts between the code requirements and the current Technical Sr :ifications (TS) exist, so an application for TS changes in accorda with 10 CFR 50.55a(g)(5)(ii) will not be submitted; and 3.

Confomance with essentially all code requirements does not seem to be impractical at this time for Calvert Cliffs Unit No.1.

It has been our position, as documented in our April 28 and November 24, 1976 and January 16, 1978 letters, that fac.ilities should submit a description of their planned ISI program, as well as any request for relief from ASME Code requirenents detemined to be impractical for your facility, at least 90 days before the start of any 40

---+,h ISI period.

Since the submittal due date for the Calvert Cliffs Unit No. i ISI program was last year, we request that Baltimore Gas and Electric reconsider its position on this subject and provide to the NRC, within 50 days of the date of this letter, the ISI program for Calvert Cliffs Unit No.1.

Sincerely, Ol b'$ ~ D

~

g Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors cc: See. ext page 1

7911050(1 1269 351

.s Baltimore Gas & Electric Company cc:

Jares A. Biddison, Jr.

Mr. R. M. Douglass, Manager General Counsel Quality Assurance Department G and E Building Room 923 Gas & Electric Building Charles Centar P. O. Box 1475 Bal timore, i aryl and 21203 Baltimore, Maryland 21203 George F. Troubridge, Esquire Shaw, Pittnan, Potts and Trowbridge 1800 M Street, M.U.

Washington, D. C.

20036 I:r. R. C. L. 01 son Baltinore Gas and Electric Company Roca 922 - G and E Building Post Office Box 1475 Bal timore, Maryland 21203 Mr. Leon B. Russell', Chief Engineer Calvert Cliffs t!uclear Power Plant Baltinore Gas and Electric Company Lusoy, !!aryl and 20657 i

Bechtel Power Corporation ATTf!: f1r. J. C. Judd Chief Nuclear Engineer 15740 Shady Grove Road Gaithersburg, riaryland 20760 Concustion Engineering, Inc.

ATT!!: ltr. P. W. Kruse,flanager Engineering Services Post Of fice Bcx SCO Windsor, Connecticut 06095 Calvert County Library Prince Frederick, fiarylanc 20678 1269 352