Text
o,,
UNITED STATES
8
3
g
NUCLEAR REGULATORY COMMISSION
.
g
,e
REGION il
% I MARIETTA ST., N.W., SUITE 3100
o
'
,
o
ATLANTA, GEORGIA 3o303
.....
SEP 2 71979
In Reply Rcfer To:
RII:JJL
50-424/79-15
50-425/79-15
.
Georgia Power Company
Attn:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this office on
,
September 11-14, 1979 of activities authorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109 for the Vogtle Nucleat Float facility, and to the dis-
cussion of our findings held with H. H. Gregory, III at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
.
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, ar.d should be prepared so
that proprietary information identified in the application is contained in a
,
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
.
.
.
.
.
1240 278
.
0
" 2o80
ff57
.
...
.
SEP 2 71979
Georgia Power ComI-ny
-2-
..
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
C. E
rphy,
ief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-424/79-15
and 50-425/79-15
cc w/ enclosures:
K. M. Gillespie
Construction Project Manager
'
Post Office Box 282
Waynesboro, Georgia 30830
E. D. Groover
QA Site Supervisor
Post Office Box 282
Waynesboro, Georgia 30830
D. E. Dutton
Projec' General Manager
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303