Forwards IE Insp Repts 50-424/79-15 & 50-425/79-15 on 790911-14.No Noncompliance Noted
ML19254E863
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/27/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19254E862 List:
References
NUDOCS 7911020457
Download: ML19254E863 (2)


See also: IR 05000424/1979015

Text

o,,

UNITED STATES

8

3

g

NUCLEAR REGULATORY COMMISSION

.

g

,e

REGION il

% I MARIETTA ST., N.W., SUITE 3100

o

'

,

o

ATLANTA, GEORGIA 3o303

.....

SEP 2 71979

In Reply Rcfer To:

RII:JJL

50-424/79-15

50-425/79-15

.

Georgia Power Company

Attn:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by J. J. Lenahan of this office on

,

September 11-14, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Vogtle Nucleat Float facility, and to the dis-

cussion of our findings held with H. H. Gregory, III at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

.

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, ar.d should be prepared so

that proprietary information identified in the application is contained in a

,

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

.

.

.

.

1240 278

.

0

" 2o80

ff57

.

...

.

SEP 2 71979

Georgia Power ComI-ny

-2-

..

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

C. E

rphy,

ief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-424/79-15

and 50-425/79-15

cc w/ enclosures:

K. M. Gillespie

Construction Project Manager

'

Post Office Box 282

Waynesboro, Georgia 30830

E. D. Groover

QA Site Supervisor

Post Office Box 282

Waynesboro, Georgia 30830

D. E. Dutton

Projec' General Manager

Georgia Power Company

Post Office Box 4545

Atlanta, Georgia 30303