ML19254E695
| ML19254E695 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/22/1979 |
| From: | Baer R Office of Nuclear Reactor Regulation |
| To: | Parker W DUKE POWER CO. |
| References | |
| NUDOCS 7911020174 | |
| Download: ML19254E695 (4) | |
Text
4 t
T$h s>**c".,,
f h
UNITED STATES i 0. ; [ ^;
NUCLE AR REGULATORY COMMISSION
! f $
C WASHING TON, D, C. 20555
% f r.'s e,[$
c
- .e eI2
- D e
Docket Nos. 50-369 and 50-370 "r.
..illiam O. Parker, Jr.
' lice President, Steam Production Duke ?c. er Company P. O. Eox 2178 22 South Church Street Charlotte,.; orth Carolina 28242
Dear Mr. Parker:
SUBJECT:
MCGUIRE MILESTONE ITEMS 1 AND 31 (McGuire fluclear Station, Units 1 and 2)
In order for us to complete our review of McGuire milestone Item 1 (NPSH of ECCS Pump) and Item 31 (RWST Capacitv) we find that we are in need of some additional information which is described in
- c Enclosure.
We request that your responsa be providad no later than November 5,1979.
Sincerely,
'l kWh $.
"?
Robert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Management
Enclosure:
Request For Additional Information ccs './enciesure:
See next pages Ok 0$$NA[
1261 309 7911020 / )
A
s
' i !! a, O. Pa rker, Jr.
. ice Pres icent, Stean Production
- te Peter Company
. C. Per zl?t
,h) l'
-22 Scotn Church Street
- arlotte, Ncrth Caroline 26242 I
m Lil.
3 cc:
Mr. W. L. Porter Duhe Pm.e r Company P. D. Box 2178 422 Scuth Church Street Charlctte, North Carolina 28242 "r. R. S. Howa rd Pc..ir Systems Di visicn
' estir.chcuse Electric Ccrporation P. O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. E. J. Keith EDS Nuclear Incorporated 220 Montgomery Street San Francisco, California 94104 Mr. J. E. Houghtaling NUS Corporation 2536 Countryside Boulevard Cl earviater, Fl orida 33515 Mr. Jesse L. Riley, President The Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 J. ' Michael itGarry,111, Esq.
Debevoise & Liberman 1200 Seventeenth Street, N. W.
Washington, D..C.
20036 Robert M. Lazo, Esq., Chairman At onic afety and Licensing Board c
U. S. L. clear Regulatory Comnission c.
v v.
v
.. _... cl e a'r ;e; t.l c : ry Ccmi s s i o n n
- r _-
.. :1cet H.
Hand, Jr., Directer
'2 rme Lao of Califernia a
..J.E 1261 310
~
.m
s
". 'i '. i i am C. Pa rk e r, Jr.
C;. <
pn cc.
/ -Sony Z. Rois,'en, Esq.
t:ctural Resources Cefer.se Council 917 - 15t h St reet, S. W.
' Mingtcn, D. C.
2C555 Richard P. Wilscq, Esq.
racistant Attcrncy Gueral State of South Cerclina 2600 bull Street Col tr bia, South Carolina 29201
?00R OR.BlK 1261 311
s ENCLOSURE 212.
Informatien provided in the s utmittal cf Aug.3..:.
..M (FM =li
.. ' 9 : i e r. :
Cuke, to H. Uenton, NRC, Re:
McGuire Nucitar S:a:::r 22 to cetermine the follo.ving:
(a) that all terms in tr.e NPSH caustion had cer- : es.::
- ria:c'./
(proper signs, et; ) when calculaticr.s.ere :erf:r e:,
(b) that the analyses. sere done at an appr:;ri5te.. :: :c
.;;'..e 1;w pressure inject;cn raximum ficw rate (35:: c:-i 2:.: ::
a a:ys s versus greater thcn 4C00 gpm by actual i.n-:'ar c:::.
(c) that changes in the sump screen (discussec in lu: s: 3: '. e : t e r )
were properly accounted for in determining er.trar.ce icsses.
Please provide additional information to resolve items a (sh;'.s n. :ers),
b (analysis assumed ficw should exceed in-plant test rur. cut fic.. f:r w;rst icw pressure injection discharge alignment), and c.
212.
The switchover procedure, described in tables 6.3.2-3, 6.3.2-3A, and
(
31 )
6.3.2-3B, does not address failure to initiate tne operatcr switchcver sequence at the RWST lo-level alarm.
It is the staff's position that failure to initiate switchover at this alarm could result in omission (or delay) of all subsequent operator actions until a seccnd alarm is encountered.
Table 6.3.1-3A identifies this seco :d alarm to cccur at
.. i.. _
.j,
~,'*r-
.ir
,rc
'f re Will be C:~
r:0 if ",i '.
[~.:':.dr :_: :~.:c is a
..C
.,,e is..-
c.
aC:i
".s are deldjdd vr.-il a seccn: alarm).
~
0.
- e ;";.,2e:
'n sL: '. c i t of t! ese added tr. ures.