ML19254E380

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-317/79-12 & 50-318/79-09 on 790716-19.No Noncompliance Noted
ML19254E380
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/12/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19254E381 List:
References
NUDOCS 7911010014
Download: ML19254E380 (2)


See also: IR 05000317/1979012

Text

W/-c.

'

8(f %)y

_P

UNITED STATES

7 fy ' g

3 1

g

NUCLEAR REGULATORY COMMISSION

.. E

REGION I

0,,

,

0[

631 PARK AVENUE

%'O

,c

KING OF PRUSSIA, PENNSYLVANIA 19406

Docket Nos.

1 2 1979

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection 50-317/79-12; 50-318/79-09

This refers to the inspection conducted by Mr. T. Foley of this office on July

16-19, 1979, at Calyert Cliffs Nuclear Power P1 ant l' nits 1 & 2, Lusby, Maryland,

of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to the dis-

cussions of our findings held by Mr. Foley with Mr. L. Russell of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (~or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure.

Any such applica-

tion must be accompanied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which contains

a statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, tha report will be placed in the Public

Document F.oom.

.

1281 .:::

79110106 @

.

,.

.

SEP 121979

Baltimore Gas and Electric

Company

2

No reply to this letter is required; however, if you should have any questions

concernino this inspection, we will be pleased to discuss them with you.

Sincerely ,

h

. - _ - p

.

Elc

Brunner, Chief _

.

Re tor Operations and Nuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Numbers 50-317/79-12 and 50-318/79-09

cc w/ encl:

R. M. Douglass , Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Supervisor, Operational QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

.

1281

"f^,

z