ML19254D939

From kanterella
Jump to navigation Jump to search
Forwards LER 79-094/03L-0
Date released: 09/25/2019 Download: ML19254D939


LER 79-094/03L-0:on 790927,once-through Steam Generator B Isolation Valve MSV-148 Was Not Properly Tested Prior to Being Returned to Svc.Caused by Defective Procedures. Procedures Will Be Revised
ML19254D947
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/19/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D947 (2)
Forwards LER 79-094/03L-0
ML19254D938
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/25/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D938 (1)