Forwards IE Insp Rept 50-293/79-05 on 790725-27.No Noncompliance Noted
ML19254D539
Person / Time
Site: Pilgrim
Issue date: 09/13/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19254D540 List:
References
NUDOCS 7910290062
Download: ML19254D539 (2)


See also: IR 05000293/1979005

Text

UNITED STATES

b

,

o

NUCLEAR REGULATORY COMMISSION

[

o

REGION I

$

$

631 PARK AVENUE

f

KING OF PRUSSI A, PENNSYLVANIA 19406

%*****/

SEP 13 im

Docket No. 50-293

Boston Edison Company M/C *,dclear

ATTN: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts

02199

Gentlemen:

Subject:

Inspection No. 50-293/79-05

This refers to tin inspectim conducted by J. J. Kottan of this office on

July 25-27, 1979, of activi

.s authorized by NRC License No. DPR-35 and to

the discussions of our findings held by J. J. Kottan with Mr. P. McGuire and

others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that ycu make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

infonnation, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790. The information sought to be withheld shall be incorpo-

rated as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

1221

222

7 DI O2 00 0 g2

3

.

.

Boston Edison Company M/C liucleat

2

No reply to this letter is required; howe.er, should you have any questions

concerning this inspection, we will be ple:, sed to discuss them with you.

Sincerely,

.

e

Ge ge H. Smith, Chief

Fu 1 Facility and Materials Safety

anch

Enclosure:

Office of Inspection and Enforcement

Inspection Report Number 79-05

cc w/ enc 1:

P. J. McGuire, Pilgrim Station Manager

A. Z. Roisman, Natural Resources Defense Council (Without Report)