Forwards IE Insp Rept 50-370/79-15 on 790808-10 & Notice of Violation
ML19254D426
Person / Time
Site: Mcguire
Issue date: 08/29/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19254D419 List:
References
NUDOCS 7910250483
Download: ML19254D426 (2)


See also: IR 05000370/1979015

Text

.

r.

d*

[pn arcq

o

UNITED STATES

! }

3 .,,

NUCLEAR REGULATORY COMMISSION

'

,

e

REGION 11

o.

8

101 MARIETT A sT . N.W., SUITE 3100

ATLANTA, GEORGIA 30303

  • ...*

In Reply Refer To:

M 29 M

-

-

RII:TDG

50-370/79-15

Duke Power Company

Attn:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office

on August 8-10, 1979 of activities authorized by NRC Construction Permit

No. CPPR-84 for the McGuire Nuclear Plant facility, Unit No. 2, and to

the discussion of our findings held with G. W. Grier at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observationt by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or uplanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

'

1209

312

=

7910250 @

-

.

.

Duke Power Company

-2-

AUG 2 91979

.

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.,

'.

Should you have any questions con _erning this letter, we will be glad to

discuss them with you.

Sincerely,

,

.'

,

C. E. Murph ,

ief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-370/79-15

cc w/ enclosure:

M. D. McIntosh, Plant Manager

Post Office Box 488

Cornelius, North Carolina 28031

J. C. Rogers, Project Manager

Post Office Box 33189

Charlotte, North Carolina 28242