Replacement Page,Inserting Footnote on Max Critical Power Ratio for Power Distribution Limits
ML19254D224
Person / Time
Site: Brunswick 
Issue date: 10/09/1979
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19254D220 List:
References
NUDOCS 7910230148
Download: ML19254D224 (1)


Text

&.

POWER DISTRIBUTION LIMITS 3/4.2.2

  • DRM SETPOINTS LIMITING CONDITION FOR OPERATION 3.2.2 The flow biased APRM scram trip setpoint (S) and rod block trip set-point (SRB) shall be established according to the following relationships:

S 1 (0.66W + 54%) T S

1 (0.66W + 42%) T RB where: S and SeB are in percent of RATED THERMAL POWER, W = LooE recirculation flaw in percent of rated flow, T = Lowest value of the ratio of design TPF divided by the MTPF obtained for any class of fuel in the core (T 1 1.0),and Design TPF for: 8 x BR fuel = 2.48 7x7 fuel = 2.60 8x8 fuel = 2.45 APPLICABILITY: CONDITION 1, when THERMA POW"R > 25% of RATED THERMAL POWER.

ACTION:

With S or S exceeding the allowable value, initiate corrective action within 15 m utes and continue corrective action so that S and S are within the required limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or reduce THERMAL 80WEgB to less than 25% of RATED Tl:dRMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REOUIREMENTS 4.2.2 The MTPF for each class of fuel shall be determined, the value of T calculated, and the flow biased nPRM trip setpoint adjusted, as required:

a.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.

Whenever THERMAL POWER has been increased by at least 15% of RATED THERMAL POWER and steady state operating conditions have been established, and Initially and at least once per 12 hcurs when the reactor is c.

operating with a LIMITING. CONTROL RCD PATTERN for MTPF.

BRUNSWICK - UNIT 2 3/4 2-9 Amendment No. 48

  • " 30lW
739 39

POWER DISTRIBUTION LIMITS 3/4.2.3 MINIMUM CRITICAL POWER RATIO LIMITING CONDITION FOR OPERATION 3.2.3 The MINIMUM CRITICAL POWER RATIO (MCPR), as a function of core flow, shall be equal to or greater than MCPR times the K shown in f

Figure 3.2.3-1, for a.

Beginning-of-cycle (BOC) to end-of-cycle (E0C) minus 2000 MWD /t, with:

1.

MCPR for 7x7 fuel = 1.20,*

2.

MCPR for 8x8 fuel = 1.21, 3.

MCPR for 8x8R fuel = 1.26.

b.

EOC minus 2000 MWD /t to E0C, with:

1.

MCPR for 7x7 fuel = 1.21,*

2.

MCPR for 8x8 and 8x8R fuel = 1.27.

APPLICABILITY: CONDITION 1, when THERMAL POWER > 25% RATED THERMAL POWER ACTION:

With MCPR less than the applicable limit determined from Figure 3.2.3-1, initiate corrective action within 15 minutes and continue corrective action so that MCPR is equal to or greater than the applicable limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.3 MCPR shall be determined to be equal to or greater than the applicable limit determined from Figure 3.2.3-1:

a.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.

Whenever THERMAL POWER has been increased by at least 15%

of RATED THERMAL POWER and steady state operating conditions have been established, and c.

Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL R0D PATTERN for MCPR.

  • For 7x7 fuel assemblies, the K factor is based.i the 112% flow f

curve of Figure 3.2.3-1 rather than the actual setpoint of 102.5%.

BRUNSWICK - UNIT 2 3/4 2-10 Amendment No. 48 1189 240