ML19254D109

From kanterella
Jump to navigation Jump to search
Requests Addl Info Re Loss of Offsite Power on 771106 to Aid in Review of Offsite Power Sys Adequacy.Requests Response within 90 Days
ML19254D109
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/18/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 7910220385
Download: ML19254D109 (3)


Text

$..

~

f p* "f %g%

UNITED STATES

[ \\ y, 3. c [' j NUCLEAR REGULATORY COMMISSION f

%,p, W% *

.E WASHINGTON, D. C. 20555 5

%g c.,

f w

s....

SEPiDGER 1 8 1979 Dockets Nos. 50-254 and 50-265 Mr. Cordell Reed Assistant Vice President Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Reed:

'9 are currently reviewing the adequacy of the offsite power systems of nuclear power plants and in particular, the loss of offsite power events at your facility. One aspect of this review concerns the history of experienced total and partial pcwer outages and attendent voltage or frequency conditions of the grid.

In our review of this natter we have drawn upon the infomation provided to us via Licensee Event Reports and followup lett'ers whiph you have sent to us. Our review of these reports indicated the loss of offsite power events have occurred at Quad Cities Nuclear Power Station on November 6,1977. To complete our review of loss of offsite power events we require the additional infomation concerning the Quad Cities Nuclear Power Station offsite grid indicated in. the enclosure to this letter.

Please provide your response to the attached questions for the Quad Cities Nuclear Power Station within 90 days of receipt of this letter.

Sincerely, k~

N honasAj:. Ippolito, Chief e

Operating Reactors Branch #3 Division of Operating Reactors

Enclosure:

P.equest for Additional Information cc w/ enclosure:

See next page 7 910220 3 JS I'

3 001

Mr. Cordell Reed Commonwealth Edison Company

-2 CEPTEtGER 1 8 1379 cc:

Mr. D. R. Stichnoth President Iowa-Illinois Gas and Electric Company 206 East Second Avenue Davenport, Iowa 52801 Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. Nick Kalivianakas Plant Superintendent Quad Cities Nuclear Power Stction 22710 - 206th Avenue - North Cordova, Illinois 61242 Anthony Z. Roisman Natural Resources Defense Council 917 15th Street ~, N. W.

Washington, D. C. 20005 Moline Public Library f04 - 17th Street Moline, Illincis 61265 Susan N. Sekuler Assistant Attorney General Environmental Control Division 188 W. Randolph Street Suite 2315 Chicago, Illinois 60601 3

002

r r

REOUEST FOR ADDITIONAL IflFORMATION A.

For losses of offsite power where less than all offsite power was lost:

1.

How many circuits to the offsite network are normally available and how many were lost during the event?

2.

What was the cause of the event?

3.

Why did the other lines not fail when some did fail?

4.

Was any voltage increase or decrease experienced just prior to or during the outage?

If so, please give details, voltages reached, affects, etc.

5.

Was any frequency decay experienced just prior to or during the outage?

If so, please give details, lowest frequency reached, decay rate, affects on equipment operation, etc.

6.

How long.was power unavailable from the circuit?

7.

Date of Event.

B.

For losses of all offsite power:

1.

How long was the power off?- How long for partial recovery? Please give details.

-2.

If turbine trip occurred, how soon after did loss of offsite power occur?

3.

If power was recovered promptly (10 minutes or less), was it due to automatic or manual actions?

4 Was any voltage increase or decrease experienced just prior to or during the outage? If so, please give details,' voltages reached, affects, etc.

5.

Was any frequency decay experienced just prior to or during the outage?

If so, please give details, lowest frequency reached, decay rate, affects on equipment operation, etc.

6.'

Date of Event.

C.

Were there any other loss of offsite pcwer events other than we have listed?

If so, please give details of each event.

3 003

.