Forwards IE Insp Repts 50-445/79-17 & 50-446/79-17 on 790709-31.No Noncompliance Noted
ML19254B336
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/21/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19254B337 List:
References
NUDOCS 7909270331
Download: ML19254B336 (2)


See also: IR 05000445/1979017

Text

{{#Wiki_filter:[[C/ , . pnRfCp

'o UNITED STATES 8hp NUCLEAR REGULATORY COMMISSION ti (;('

j j

REGION IV 0, ' 4 4 611 RYAN PLAZA DRIVE, SUITE 1000 U ' o ARLINGTON, TEXAS 76012 ..... August 21, 1979 In Reply Refer To: RIV Docket No. 50-445/Rpt. 79-17 50-L46/Rpt. 79-17 Texas U-*- 4= Generating Co=pany ATTN: L+ . R. J. Gary, F.zecutive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen: This refers to the inspection conducted by our Resident Inspector, Mr. R. G. Taylor, during the period of July 1979 of activities authorized by NRC Con- struction Per=its No. CPPR-126 and 127 for the Comanche Peak facility, Units No.1 and 2, and to the discussion of our findings with Mr. R. G. Tolson and other rembers of your staff during the inspection period. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and obse:rvations by the inspector. Within the scope of the inspection, no items of noncompliance were identified. We have also examined actions you have taken in regard to a previously identified finding. The status of this item is identified in paragraph 2 of the enclosed report. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If the report contains any information tl.x you believe to be proprietary, it is necessary that you submir a written application to this office, within 20 days of the date of this letter, requesting that such information be withheld from public disclosure. The application must include a full statement of the reasons why it is claimed that the information is proprietary. The application should be prepared so that any proprietary information identified is contained in an enclosure to the application, since the application without the enclosure will DhhD L dJ 1046 080 f RQ - @ ~ T q ~ .s Uh _ Al J LkJ LJ 7009270 3319

1 .

Texas Utilities Generating Company -2- August 21, 1979 also be placed in the Public Document Room. If we do not hear from you in this regard C"" the specified period, the report will be placed in the Public Docu=ent Room. Should yor have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, . , / / W. C. Sei te, Chief Reactor C struction and Engineering Support Branch Enclosure: IE Inspection Report No. 50-445/79-17 50-446/79-17 cc: w/ enclosure Texas Utilities Generating Company ATTN: Mr. H. C. Schmidt, Project Manager 2001 Bryan Tower - Dallas, Texas 75201 . % 0 / e AD q@'p ag] T J~' ~ cuj u l b 1L 1946 081 " }}