ML19253C538

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-317/79-09 on 790618-21.No Noncompliance Noted
ML19253C538
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/25/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19253C539 List:
References
NUDOCS 7912060022
Download: ML19253C538 (2)


See also: IR 05000317/1979009

Text

Y$

%

=

UNITED STATES

p gg

o

NUCLEAR REGULATORY COMMisslON

y

o

REGION I

$

$

631 PARK AVENUE

'[

KING OF PRUSSI A. PENNSYLV ANIA 19406

%,

/

...**

Docket No. 50-317

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Sub. ject:

Inspection 50-317/79-09

This refers to the inspection conducted by Mr. J. P. Durr of this office on

June 18-21,1979 at the Calvert Cliffs Nuclear Station, Unit 1, Lusby, Maryland

of activities authorized by NRC License No. DPR-53 and to the discussions of our

findings held by Mr. Durr with Mr. L. Russell of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

1509

200

7912060 0 1 1

.

Baltimore Gas and Electric Co.

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

h

Robert T. Carlsok Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-317/79-09

cc w/ enc 1:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

.-

1509

201