ML19253C335

From kanterella
Jump to navigation Jump to search
Forwards LER 79-103/03L-0
Date released: 09/24/2019 Download: ML19253C335


LER 79-103/03L-0:on 791024,makeup Pump MUP-1B Discharge Line Vent Valve MUV-291 Found Leaking.Caused by Cyclic Vibration Fatigue.Makeup Pump Returned to Svc.Engineering Evaluation Underway
ML19253C338
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/16/1979
From: Lancaster K
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253C338 (2)
Forwards LER 79-103/03L-0
ML19253C334
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/26/1979
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253C334 (1)