ML19253B672
| ML19253B672 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/23/1974 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19253B667 | List: |
| References | |
| NUDOCS 7910160755 | |
| Download: ML19253B672 (2) | |
See also: IR 05000289/1974032
Text
A
UNITED ST ATES
^
-
,
'
-
ATOMIC ENERGY COMMISSit . .
r'
,-
8
oentcf oRatt oF REGUL.AfdRY OPER ATIOPe
A
REGlope s
l*
631 PARK AVENUE
l
%
-
%
(,
)f
KIN OF PRUSSI A, PENNSYl.,VANI A 194C6
,
n.n , ..
OCT 2 31974
Metropolitan Edison Company
License No. DPR-50
Attention:
Mr. R. C. Arnold
Insp. No. 50-289/74-32
Vice President
P.O. Box 542
Reading, Pennsylvania
19603
Gentlemen:
This refers to the inspection conducted by Mr. Ruhlman of this office
on October 7-9, 1974 at the Three Mile Island Unit 1 Plant, Middletotm ,
Pennsylvania of activities authorized by AEC License No. DPR-50
and to the discussions of our findings held by Mr. Ruhlman and other
members of this office with Mr. Herbein and other me=bers of your staff
at the conclusion of the inspection, and to a subsequent telephone
discussion between Mr. Ruhlman and Mr. Miller of your staff on October 10,
1974.
Areas examined during this inspection are described in the Regulatory
Operations Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel,
and observations by the inspector.
Our inspector also verified the steps you had taken to correct the
violation brought to your attention in a letter dated October 4,1974,
following our inspection number 50-289/74-20. We have no further questions
regarding this matter.
During this inspection, it was found that certain of your activities
appeared to be in violation of AEC requirements.
The items and
references to the pertinent requirements are listed in the enclosure
to this letter. This letter constitutes a notice sent to you
pursuant to the provisiens of Section 2.201 of the AEC's " Rules
of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within 20 days
of your receipt of this notice, a written statement of explanation
in reply, including: (1) corrective steps which have been or will
be taken by you, and the results achieved; (2) corrective steps
which will be taken to avoid further violations; and (3) the
date when full compliance will be achieved.
.
7 910160 7FS
-
.
, . ,
-
,.
-2-
.
.
-
.
As indicated in Enclosure No. 1 to this letter, we note that
you have corrected Item Nos. 2 and 3, and therefore, you need not
address yourself to these matters in your response.
In accordance with Section 2.790 of the AEC's " Rules of Practice",
l' art 2, Title 10, Code of Federal Regulations, a copy of this
letter and. the enclosed inspection report will be placed in the
AEC's Public Document Room.
If this report contains any information
that you (or your contractor) believe to be prop.letary, it is
necessary that you make a written application within 20 days to
this office to withhold such information from public disclosure.
Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a
separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be
placed in the Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
&f
-.
f* W
r,
Eldon J. Brunner, Chief
Reactor Operations Branch
Enclosure:
1.
Description of violations
2.
RO Inspection Report No. 50-289/74-32
J. G. Herbein, Station Superintendent
cc:
.
R. W. Heward, Project Manager, GPUSC
'
_.. . . _ . . _ _ _ _ .
. . . _ _ _ .
- , - - _
--
)
bec: R0 Chief, FS&EB
j
RO:HQ (4 cpys of ler., 5 epys of report)
{
RO Files
i
Central Mail & Files
1
DL (4 cpys of ltr.,13 epys of report)
'
RS (1 cpy of ltr., 3 cp,1 of report)
'
Local PDR
l
Reg Reg Reading Room
)
gg-
I35
I
State of Pennsylvania
RO Directors ((II, III, IV) (Report Only)
i
Miss *fary V. Southard Chairman Citizens for a Safe Environment
i