ML19253B518
| ML19253B518 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/23/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19253B519 | List: |
| References | |
| NUDOCS 7910160350 | |
| Download: ML19253B518 (2) | |
See also: IR 05000245/1979009
Text
Yb
.
.
Sn maa
UNITED STATES
jo
NUCLEAR REGULATORY COMMI5slON
o
REGION I
$
$
431 PARK AVENUE
KING OF PRUS$1 A. PENNSYLVANIA 19404
%, + . . . p
Docket Nos. 50-245
M
1978
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
.
Subject:
Combined Inspection 50-245/79-09; 50-336/79-09
This refers to the inspection conducted by Mr. T. Shedlosky of this office on
March 17 - April 30,1979, at the Millstone Nuclear Power Station, Waterford,
Connecticut, of activities authorized by NRC License Nos. DPR-21 and DPR-65 and
to the discussions of our findings held by Mr. Shedlosky with Mr. J. Opeka and
others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974. This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Although Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice a written statement of
explanation, we note that this item of noncompliance was corrected prior to the
completion of our inspection, and therefore, no response with respect to this
matter is required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any in-
formation that you (or your contractor) believe to be proprietary, it is necessary
s,
,
b
-
)1
7910160 3 5 o
.
.
Northeast Nuclear Energy Company
2
AUG 2 31979
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must oc accompanied
by an affidavit executed by the owner of the information, which ident1fies the
document or part sought to be withheld, and which centains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790.
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
%
Ed
J. Brunner, Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Combined Inspection
Numbers 50-245/79-09; 50-336/79-09
cc w/encls:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman, Natural Resources Defense Council (Without Report)
i; n
-~
,
i
,
J-