Forwards IE Insp Repts 50-413/79-14 & 50-414/79-14 on 790724-27.No Noncompliance Noted
ML19253A897
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/16/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19253A896 List:
References
NUDOCS 7909120292
Download: ML19253A897 (2)


See also: IR 05000413/1979014

Text

[g Rf G(,g 'o

UNITED STATES

  • E '

[,j

NUCLEAR REGULATORY COMMISSION

-

.n

%

-J

c

REGION 11

'"

k

h'f

101 MARIETT A sT.. N.W.. SUIT E 310o

ATLANTA, GEORGI A 30303

'% .'.W...[

In Reply Refer To:

AUG 161979

RII:CRM

50-413/79-14

50-414/79-14

Duke Power Company

Atta:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this

office on July 24-27, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station

facility, Unit Nos. I and 2, and to the discussion of uar findings held

with R. A. Morgan at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

,

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items.

The status of these

items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Tit:

10, Code of Federal Regulations, a copy of this letter and

the enclose.

spection report will be placed in the NRC's Public

Document Rocc

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of whicb it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this b,ijd117

regard within the specified period. the report will be placed i:. the

Public Document Room.

7909120 U2

.

AUG i 619/9

-

.

'

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

C. E.

rphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-413/79-14

and 50-414/79-14