ML19253A897
| ML19253A897 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/16/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19253A896 | List: |
| References | |
| NUDOCS 7909120292 | |
| Download: ML19253A897 (2) | |
See also: IR 05000413/1979014
Text
[g Rf G(,g 'o
UNITED STATES
- E '
[,j
NUCLEAR REGULATORY COMMISSION
-
.n
%
-J
c
REGION 11
'"
k
h'f
101 MARIETT A sT.. N.W.. SUIT E 310o
ATLANTA, GEORGI A 30303
'% .'.W...[
In Reply Refer To:
AUG 161979
RII:CRM
50-413/79-14
50-414/79-14
Duke Power Company
Atta:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by C. R. McFarland of this
office on July 24-27, 1979 of activities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station
facility, Unit Nos. I and 2, and to the discussion of uar findings held
with R. A. Morgan at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
,
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items.
The status of these
items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Tit:
10, Code of Federal Regulations, a copy of this letter and
the enclose.
spection report will be placed in the NRC's Public
Document Rocc
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of whicb it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this b,ijd117
regard within the specified period. the report will be placed i:. the
Public Document Room.
7909120 U2
.
AUG i 619/9
-
.
'
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
C. E.
rphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-413/79-14
and 50-414/79-14
cc w/ enclosures:
D. G. Beam, Project Manager
Post Office Box 223
Clover, South Carolina 29710
b[UO118
6