ML19253A892

From kanterella
Jump to navigation Jump to search
Notifies of 790912-14 Workshop W/State Officials in Columbia,Sc to Discuss Nuclear Facility Decommissioning Policy.Forwards Agenda,Background Statement & Attendee List. W/O Encl
ML19253A892
Person / Time
Issue date: 07/17/1979
From: Ryan R
NRC OFFICE OF STATE PROGRAMS (OSP)
To: Gressette L
SOUTH CAROLINA, STATE OF
Shared Package
ML19253A890 List:
References
NUDOCS 7909120277
Download: ML19253A892 (2)


Text

. a anc o

,/-

  • 4'e, C

UNITED STATES e TS e f

^

NUCLEAR REGULATORY COMMISSION l c

< i 4... ^ /-

.e t

WASHINGTON, D. C. Oc555 o

a.

eg' j-o July 17, 1979 The Eencrable L. Marien Cressette Scuth Carclina Sena:e Celu:bia, Scuch Carclina 19^11 Lear Mr. Gresse :e:

The Nuclear Regula: cry Cc==issien (NRC) has been engated in the develep-

=ent of a =cre explicit pelicy fer nuclear facility decc==issiening.

In Septe=ber 1978 ve held a set of regicnal verksheps to review with State efficials the specifics cf the NEC plan.

In respense te the ec=:ents, the plan was =cdified.

NUREG-0436, Revisien fl was issued in Dece ber 1979 and sen: to all the States fer ce= rent.

A followup set of verkshops to discuss technical studies eq=pleted since last year, a prelizinary draft of a generic ervirceental impac: statement, and draft proposed rule changes, will be held en September 12-14, Celu:bia, Scuth Carclina and Septe:ber 25-27, Seattle, Washing:cn.

An agenda is enclosed.

I invite ycu to designate twe cembers of ycur legislative bcdy to participate in these worksheps.

You may, cf course, send others as cbservers.

In the evon: tha: there are budgetary difficulties, sete funds :ay be available fer travel.

I a: also sending letters of invitation te the Gevernor and the public utility regult. cry group. A list of of the State's attendees at the September wcrkshop is enclesed, We have had suggestiens a: the previcus verkshops that it veuld be useful for the participants c cur a nuclear facility prier to discussing any new NRC preposed regula:1 ens er guidelines.

The attendees generally agreed that such a tour would give the participants a better perspective of what veuld be entailed in decc= issioning these facilities.

Over the pas few =enths we

'. ave pelled :he participants of the Septe:ber 1975 verksheps te see if there was still interes: in taking a tcur pric: to this verkshep.

Su: the resperse was geographicall:. di ided.

There was a centinued in:erest frc: those partic-ipants who wculd ge te the verkshep in Columbia, See:h Carclina.

Hence, we have arranged f er a f or:al : cur en September 11 ef Su= er 1, a nuclear power plan: under cens:ructien, and the icw-level burial ground in Sarnwell, Scu:h Carclina.

300R ORENM. 2e0912o 77 u.ma

. Surprisingly, there was little irterest in a tour cf Hanferd fre: these States that vould participate in the Seattle verksheps.

Theref ore, we are net conducting a for:al teur.

k'e have, however, =ade arrangements with the Richland Operations Office of the Department cf Energy to provide a : cur if se e of the par:icipants vant to travel :o Hanferd en Septe=ber 23 for a tour en September 24 They would have to return to Sea::le en the evening cf the 24th in crder to be available for the star: of the verkshop, on the following

=crning.

Another suggestien that came out of our September le76 verkshops was that each State's representatives to the next verkshop have the epportunity to caucus before ec=ing to the verkshop.

The purpcse of the caucus vculd be t o develep the State's positien en the issues that vill be discussed.

1 sepper this idea and will previde you er yeur designated representa: ice vith the apprcpriate infer:stien in advance of the teeting.

I veuld appreciate it if ycu uculd designate ycur representatives, their positions, addresses and telephene numbers and nctify the centracter who is providing supper: fer the verkshep: Ms. Sharen The:psen-Cchen, FEER, Censultants, Inc., 1160 Rockville Fike, Suite 202, Rockville, Maryland 20$52, (301) 340-7990.

Sc that we can rake the necessary travel and : cur arrange ents, we need :o kncv who yeur representatives are by July 27.

I a= enclosing. background caterial en the issues to be discussed.

~-

.e',cere y,

~

j Ecber: G.

Ryan, Directorj/

Office of State Fregrams Inclosures:

1.

Agenda 2.

Eackground State =en:

3.

State Attendee List NM SilGM cE.,....

'M 4/ 9) #) kN OA