Submits Facts Re NRC Policy Concerning Implementation of General Design Criterion 3 for Fire Protection.Urges Maint of Mods Schedules for Oct 1980.Submittal of Info Re Open Items & Design Details Should Be Expedited
ML19253A261
Person / Time
Site: Calvert Cliffs  
Issue date: 08/09/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 7908210059
Download: ML19253A261 (2)


Text

/

%h4 4

t4A "IGOg

/Ig A

UNITED STATES

/

{yn g

NUCLEAR REGULATORY COMMIS3tuF 4

.[ \\

r E WASHINGTON, D. C. 20S55 f

o a

\\

,/

August 9, 1979 Yo'ckets Nos. 50-317 and L 348--

Mr. A. E. Lundvall, Jr.

Vice President - Supply Baltimore Gas & Electric Company P. O. Box 1475 Baltimore, Maryland 21203

Dear Mr. Lundvall:

In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection.

Since that time, you have performed a fire hazards analysis for your facility and have compared its fire protection program with tne NRC guidelines.

In late 1976, we set October 1980 as the date for completing the imple-mentation of all modifications associated with this program.

This implementation schedule recognized that such modifications should be complet'd as soon as practical, with due ccnsideration of the nature of ae modifications.

For example, minor modifications, adoptior, s administrative controls and additional portable equip-ment would be completed within six months; however, major modification.;

would require a year or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the t$ ion of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.

We urge you to apply your best efforts to maintain your schedules for completion of all of the fire protection modifications at your facility (fes) and to submit, on an expedited basis, any information that is still outstanding with regard to open itens and required design details.

Sikcerely, t

N

&*O D. Eisenhut, acting Director Division of Operatirg Reactors Office of i:uclear Reactor Regulation cc See next page 805 353 7908210057

/

Baltina e Gas & Electric Company cc:

Janes A. Biddison, Jr.

Mr. R. M. Douglass, Manager General Counsel Quality Assurance Departnent G and E Building Room 923 Gas & Electric Building Charles Center P

O. Box 1475 Baltimore, Maryland 21203 baltimore, Mary'and 21203 George F. Trowbridge, Esquire Shaw, Pi ttnan, Potts and Trowbridae 1800 M Street, N.U.

Washington, D. C.

20036 11r. R. C. '.. Ol son Baltimore Gas and Electric Company Room 922 - G and E Building Post O'fice Box 1475 Baltimore, Maryland 21203 Mr. Leon B. Russell, Chief Engineer Calvert Clif fs t!uclear Power Plant Baltinore Gas and Electric Company Lusoy. liaryl and 20657 Bechtel Power Corporation ATTN: fir. J. C. Judd Chief Nuclear Engineer 15740 Shady Grove Road Gaithersburg, Maryland 20760 Combustion Engineering, Inc.

ATTH: tir. P. W. Kruse, Manager Engineering Services Post Office Box 500 Windsor, Connecticut 06095 Calvert County Library Prince Frederick, liaryland 20678 e

805 354