ML19250C439
| ML19250C439 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/21/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19250C436 | List: |
| References | |
| NUDOCS 7911260125 | |
| Download: ML19250C439 (2) | |
See also: IR 05000302/1979035
Text
e
km Ato
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
A
g
c
REGION 11
101 MARIETTA ST
N.W., SUITE 310o
o
ATLANTA, GEORG!A 303o3
.....
In Reply Refer To:
RII:SCE
50-302/79-35
SEP 211979
-
Florida Power Corporation
Attn:
W. P. Stewart, Manager
Nuclear Operations
Post Office Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by S. C. Ewald of this office on
August 28-31, 1979 of activities authorized by NRC Licene No. DPR-72
for the Crystal River facility, and to the discussion of our findings
held with G. P. Beatty, Jr. at the conclusion of the inspection.
The inspection was an examination of the activities conducted under y or
license as they relate to radiation safety and to compliance with the
Commission's rules and regulations and the conditions of your license.
The inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations by
the inspector.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report. These items will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
7911260 1
.
SEP 211979
,
g
Florida Power Corporation
-2-
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/79-35
cc w/ enclosures:
G. P. Beatty, Jr.
Nuclear Plant Superintendent
Post Office Box 1240
Crystal River, Florida 32629
$ b
k
/b t)
.-
m
9