74 Qn "Easi
,o, UNITED STATES
[g') ) n j
NUCLEAR REGULATORY COMMISSION s fg';[
1 e REGION 1 0,'f6' g
631 PARK AVENUE D
%,,'%+"
,o KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-293 OCT 1 91973 Boston Edison Company M/C Nuclear ATTN: Mr. G. Carl Andognini, Manager Nuclear Operations Department 800 Boylston Street Boston,fbssachusetts 02199 Gentlemen:
Enclosed is IE Circular No. 79-21. " Prevention of Unplanned Releases of Radioactivity," which provides information on inadvertent releases /on-site spills of radioactivity. Should you have any questions related to the enclosed suggested preventive measures, please contact this office.
Sincerely, Wh Yf&
yce H. Grier
- ector
Enclosures:
1.
IE Circular No. 79-21 2.
List of IE Circulars Issued in the Last Six Months cc w/encls:
P. J. McGuire, Pilgrim Station Manager 1274 100 79110 0 8
ENCLOSURE 1 Accession No.:
7908220128 SSINS:
6830 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 October 19, 1979 IE Circular No. 79-21 PREVENTION OF UNPLANNED RELEASES OF RADIOACTIVITY Numerous incidents of unplanned releases of radioactivity have been reported to the NRC within the past few months.
These incidents of leaks, overflows and spills have resulted in contamination of areas outside of plant buildings.
The attached table provides you with summary information on these events, their apparent causes, the radiological consequences and the corrective actions.
We believe that a number of these incidents could have been avoided and preven-tive actions for these types of unplanned releases should be instituted by all reactor licensees.
Based on the reported incidents, the following preventive measures can minimize the occurrence of such events.
1.
Review of procedures for transfer of radioactive liquids.
Errors in written procedures have led to =istakes in valve line-ups and tank overflows. Written procedures, including check lists for valve line-ups, should be developed and followed for operations which could cause spills of radioactivity.
Management controls, including audits, should be employed to assure verbatim compliance with such procedures.
2.
Review of "as built" systems having the potential of inadvertent releases because of design or construction errors.
Consider items such as:
a.
Tank overflows should be routed to liquid radwaste tanks.
b.
Storm drains should be located away from areas with a high potential for spills, c.
Consideration should be given to drip pans under equipment, such as pumps and valves, from which leakage is expected.
d.
Cofferdams should be installed under doors to areas with a potential for radioactive spills.
e.
Preoperational testing should that would permit radioactivi unit (s) under construction.
DUPLICATE DOCUMENT 3.
Periodically functionally test and of systems that could cause an ina Entire document previously corrosion degradation have occurre entered 'nto system under:
to cause leaks.
New permanent and 1274 101 Y,