J. P. O'Reilly, Res.an I FS&E3 ACTIC: C0!m0L FORM A.
Action Code CDR-181 Name of Licensee and Facility fietropolitan Edison Co. (Three Mile Isl. l',
Docket No. or License No.
50-289 Title Core Flood System Valve Failure Origin utili+v Date Rec'd 9/22/73 B.
FS&E3 Branch Coordinator:
Bryan Dreher X
Ellis Paulus f
Cot:plet/on Requested by j
C.
Action Requested of:
I ADPIMP M&PPOB EPB RPB ADC0 OB CB TAB OOE Region I l
Date Reguested _ 10/11/73 Coepletion Requested by l
Reference 11emo, J. G. fliller to D. F. Knuth dtd. 9/18/73 D.
Action Requested The Metropolitan Edison Company CDR of 9/18/73 covering the core flood system. valve CF-V-1A failure to operate is being assigned to Region I for evaluation of technical adequacy of the corrective action being taken and final resolution of the deficiency.
E.
Date Action Co=pleted Close-out (Date & Method)
Cor=ents:
If completion date is not consistent with your work schedule, please.let us know.
1
- yk J./G. Davis,DeputyDirector for Field Operations Directorate of Regulatory Operations