ML19250A846
| ML19250A846 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 08/28/1979 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Alkema R GENERAL ELECTRIC CO. |
| Shared Package | |
| ML19250A842 | List: |
| References | |
| SNM-1097, NUDOCS 7910240686 | |
| Download: ML19250A846 (2) | |
Text
.
leTrrir.L TR'."r"TT:D HEPIYETH
- p* **0vq'o CDMTfL 5 2 L 3 C i S.L W UNITED STATES g
8 NUCLE AR REGULATORY COMMISSION o
E REGION 11 o,
101 MARIETT A ST., N.W SU'7E 3100 l
ATLANTA, G EoRGI A.s0303 In Reply Refer To:
RII:FPG AUG 2 81979 70-1113/79-15 General Electric Company Attn:
R. J. Alkema, General Manager Wilmington Manufacturing Department Post Office Box 780 Wilmington, North Carolina 28401 Gentlemen:
This refers to the inspection conducted July 18-19, 1979, by Messrs. A. G. Finley and J. P. Patterson of the NRC RIII Office, Glen Ellyn, Illinois in conjunction with a request for assistance by the NRC RII Office, Atlanta, Georgia.
Findings were discussed with Mr. W. B. Smalley, Senior Engineer, Environmental Protection, and other members of your staff at the conclusion of the inspection. The inspection was a review of activities at the General Electric Wilmington Plant authorized by NRC License No. SNM-1097.
Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, code of Federal Regulations, Part 70, "Special Nuclear Material", and specific License conditions. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, performance tests, and observations by the inspectors.
During the inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirements.
This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
This notice is sent to you pursuant to the pr ovisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including: (1) corrective steps which have been taken to avoid further noncompliance; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.
Details of activities involving safeguards and security measures are exempt from disclosure in accordance with 10 CFR 2.790(d). Therefore, your response should be incorporated in a separate paper and referenced in your reply.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosures to this letter with the exception of the report cover page, which is an inspection summary, will not be placed in the Public Document Room.
\\
MATERIALTRA!!SMITTED HERMITH (Sb C0! iia 1:iS 2.701:iF3.T2. TON 7910240
MAT. Rl'il T.S"F"TT~~) !>re 773 w
CONTI.lhS 2.7 3i::F;.'J a.;;l General Electric Company
- AUG 2 81979 Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, W '
p(LW. B. Kenna, Chief Safeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation (Exempt from Disclosure) 2.
Inspection Report No. 70-1113/79-15 (Exempt from Disclosure) 3.
Inspection Summary (Not Exempt) cc w/encts:
A. L. Kaplan, Manager Licensing and Compliance Audits Post Office Box 780, Mail Code J-26 C. M. Vaughan, Manager Nuclear Materials Management Post Office Box 780, Mail Code K-88 Wilmington, North Carolina 28401 1207 157 MATER!Al.TP3.NS.%TTED Hr.?:TH CONTAINS 2.72;Iirc.Jg,7::;!