ML19250A776

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/79-31 on 790829-30.No Noncompliance Noted
ML19250A776
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/18/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19250A772 List:
References
NUDOCS 7910240571
Download: ML19250A776 (2)


See also: IR 05000369/1979031

Text

.'

o

UNITED STATES

~ , ,

8

NUCLEAR REGULATORY COMMISSION

n

g

c

REGION 11

o,

101 MARIETTA ST

N.W., SUITE 3100

%e

ATLANTA, GEORGIA 303o3

o

ru.

In Repi;. Refer To:

RII:TJD

50-369/79-31

@g g

Duke Power Company

Atta:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by T. J. Donat of this office on

August 29-30, 1979 of activities authorized by NRC Construction Permit

No. CPPR-83 for the McGuire facility, and to the discussion of our

findings held with M. D. McIntosh at the conclusien of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Docement Room.

1206

130

7910240 5 '7/

.

-

..

Duke Power Company

-2-

I

$h

.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

p.c.

R. C.

ewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-369/79-31

cc w/ enclosure:

M. D. McIntosh, Plant Manager

Post Office Box 488

Cornelius, North Carolina 28031

J. C. Rogers, Project Manager

Post Office Box 33189

Charlotte, North Carolina 28242

\\2Do \\5\\

i

'