ML19250A663

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/79-18 & 50-330/79-18 on 790821-23 & Notice of Violation
ML19250A663
Person / Time
Site: Midland
Issue date: 09/11/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19250A664 List:
References
NUDOCS 7910240171
Download: ML19250A663 (2)


See also: IR 05000329/1979018

Text

'L

a aeog

h

m

  • /

o

UNITED STATES

"

8

NUCLEAR REGULATORY COMMISSION

'

3.,,,

n

E

REGION 111

$

"

'[

"

o

o,

799 ROOSEVELT ROAD

j'

GLEN ELLYN. ILLINOIS 60137

SEP 111979

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Messrs. K. R. Naidu and

G. F. Maxwell of this office on August 21-23, 1979, of activities M the

Midland Nuclear Plant, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-81 and No. CPPR-82 and to the discussion of our findings

with Messrs. T. Cooke, J. Corley and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within thest areas, the inspection consisted of a

selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requir= ents, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice a written statement or explanation in reply,

inclading for each item of noncompliance: (1) corrective action taken and

the results achieved; (2) corrective action to be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public

Document Room, except as follows.

If the enclosures contain information

that you or your contractors believe to be proprietary, you must apply in

writing to this office, within twenty days of your receipt of this letter,

.

1202 MB

7D10240 ) /-

.

.

S P 1 y 7379

Consumers Power Company

-2-

to withhold such information from public disclosure. The application

must include a full statement of the reasons for which th information is

considered proprietary, and should be prepared so that pr oprietary

information identified in the application is contained in an enclosure to

the application.

We will gladly discuss any questions you have concerning '.his

inspection.

Sincerely,

.

ph

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Reports

No. 50-329/79-18 and

No. 50-330/79 '8

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Dr. Wayne E. North

Myron M. Cherry, Chicago

.

h

1202

349