Text
jY0
f io
o
UNITED STATES
,-
8
NUCLEAR REGULATORY COMMISSION
X_.
O
o
REGION 11
.O t
g
9,
3[
101 MARlETTA ST., N.W., SUITE 3100
f4( 7
.
AT LANTA, GEORGIA 3o3o3
s
SEP 111979
In Reply Refer To:
RII:WPA
50-269/79-22
50-270/79-20
50-287/79-
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 33189
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by W. 5
Ang of this office on
August 20-23, 1979, of activities authorized by C Operating License Nos.
DPR-38, DPR-47 and DPR-55 for tne Oconee facility, and to the discussion of our
findings held with J. Wells at the Charlotte office and E. Smith at the site at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, th: inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
.
1202
258
CC'
7910240
____ _
_ _ _
.
SEP 111979
Duke Power Company
-2-
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-269/79-22,
50-270/79-20 and 50-287/79-22
cc w/ enc 1:
J. E. Smith, Station Manager
P. O. Box ?175