Forwards IE Insp Repts 50-269/79-22,50-270/79-20 & 50-287/79-22 on 790820-23.No Noncompliance Noted
ML19250A618
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/11/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19250A619 List:
References
NUDOCS 7910240077
Download: ML19250A618 (2)


See also: IR 05000269/1979022

Text

jY0

f io

o

UNITED STATES

,-

8

NUCLEAR REGULATORY COMMISSION

X_.

O

o

REGION 11

.O t

g

9,

3[

101 MARlETTA ST., N.W., SUITE 3100

f4( 7

.

AT LANTA, GEORGIA 3o3o3

s

SEP 111979

In Reply Refer To:

RII:WPA

50-269/79-22

50-270/79-20

50-287/79-

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W. 5

Ang of this office on

August 20-23, 1979, of activities authorized by C Operating License Nos.

DPR-38, DPR-47 and DPR-55 for tne Oconee facility, and to the discussion of our

findings held with J. Wells at the Charlotte office and E. Smith at the site at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, th: inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

1202

258

CC'

7910240

____ _

_ _ _

.

SEP 111979

Duke Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-269/79-22,

50-270/79-20 and 50-287/79-22

cc w/ enc 1:

J. E. Smith, Station Manager

P. O. Box ?175

Seneca, SC 29678

.

1202