ML19250A590

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-483/79-09 on 790829-30.No Noncompliance Noted
ML19250A590
Person / Time
Site: Callaway 
Issue date: 09/14/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Byran J
UNION ELECTRIC CO.
Shared Package
ML19250A591 List:
References
NUDOCS 7910240019
Download: ML19250A590 (2)


See also: IR 05000483/1979009

Text

_

..

..

-L /2

..s

.

.[

'

o

UNITED STATES

~ , ,

!"

3

NUCLEAR REGULATORY COMMISSION

o

$

E

REGION 111

o,

[

799 ROOSEVELT ROAD

%

,e*

GLEN ELLYN. ILLINOIS 60137

SEP 141979

Docket No. 50-483

Union Electric Company

ATTN:

Mr. John K. Dryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Mr. W. B. Grant of this office

on August 29 and 30, 1979, of activities at the Callaway Plant, Unit 1,

authorized by NRC Construction Permit No. CPPR-139 dated April 16, 1979,

and to the discussion of our findings with Mr. W. Weber and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the application.

..

1202

162

7910240O\\9

.

. . . . . --

.

.

SEP 14 DU

Union Electric Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

b

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclo wre:

IE Inspection

Report No. 50-483/79-09

cc w/ enc 1:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Regions I & IV

Ms. K. Drey

Hon. C. J. Frass, Chairman

Missouri Public Service

Commission

1202

163