Text
o arog
,
/
Io
UNITED STATES
g
!
NUCLEAR REGULATORY COMMISSION
),g
n
E
REGION lli
$
"
0,
[
799 ROOSEVELT ROAD
% **%/ /
Ot. tN ELLYN. lLLINOIS 6o137
- .*
SEP 13 pa
Docket No. 50-282
Docket No. 50-306
Northern States Power Company
ATTN:
Mr. Leo Wachter
Vice President
Power Production and
System Operation
414 Nicollet Mall
Minneapolis, MN 55401
Gentlemen:
This refers to the inspection conducted by Mr. I. T. Yin of this office
on September 5, 1979, of activities at the Prairie Island Nuclear
Generating Plant, Units 1 and 2, authorized by NRC Operating Licenses No.
DPR-42 and No. DPR-60 and to the discussion of our findings with
Mr. F. P. Tierney and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows. If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure to
the application.
1202
140'
,19102 40003
.
Northern States Power Ccepany
-2-
SEP 1 3 1979
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
'h
fu
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Reports No. 50-282/79-22
and No. 50-306/79-17
cc w/ encl:
Mr. F. P. Tierney, Jr.,
Plant Manager
Mr. John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
Central Files
Reproduction Unit NRC 20b
Local PDR
)202 \\4\\