'O f

Gw sTl // /' - r' 1 ) i i((

I/ r s s>R RfCy f_

jo UNITED STATES Q

g NUCLEAR REGULATORY COMMISSION y ; e(3 g WASHINGTON, D. C. 20555

.g({(. p y.v

/

SEP 111579 MEMORANDUM FOR:

G. Lainas, Chief, Plant Systems Branch; DDR FROM:

V. Panciera, Plant Systems Branch, DOR

SUBJECT:

STATUS SHEETS FOR CONTRACTOR ASSISTANCE TASKS Attached are updated sheets which give the present status of work being perfonned by contractors under our technical assistance program.

The next update (in October 1979) will include scheduled completion dates for contractor work to be accomplished during FY 1980.

[

I W

V.

anclera Plant Systems Branch Division of Operating Reactors cc w/ enclosure:

D. Eisenhut B. Grimes PSB Section Leaders PSB Task Managers - Individual sheets G. Zech V. Panciera 0

130

  1. 6 "

7910020

ELECTRICAL INSTRUMENTATION AND CONTROL SYSTEM SUPPORT Contractor - EG&G PSB Task Manager - Paul Shemanski Total Number of Licensing Or Generic Actions Assigned - 72 Total Number of Licensing Or Generic Acticns To Be Completed By EG&G ink.FY 79

.22 Number Completed by Contractor - 12' PSB

-4 P.M.

-3 Total Planned Cost - $115K Funds Expended - 1st Quarter - $11K ;

2nd Quarter $31K ate:

3rd Quarter - $50K ;

4th Quarter $85K Estimate I. Reactor Coolant System Overpressure Protection Licensing Action Completed Completed Issued By By Contractor By PSB P.M.

Surry 1 5/79C 8/79 Surry 2 5/79C 8/79 Turkey Point 3 5/79C 8/79 Turkey Point 4 5/79C 8/79 St. Lucie 5/79C 8/79 Arkansas 1 WhcP4 10/79 S/JWL 11/79 Crystal River 3 6/79C 6/79C 7/79C Oconee 1 4/-4 11/79 WJa 12/79 Oconee 2 4/-4 11/79 WJ& 12/79 Oconee 3 4ECAS 11/79 S/J4L 12/79 Three Mile Island 1 7/79C e/J4L 12/79 Rancho Seco

-% API 12/79 4VJ5L l'/80

  • N.S. - Not scheduled to be completed in FY 79.

O 131

II.

Degraded Grid Voltage Licensing Action Completed Completed Issued By Contractor By PSB By PM Beaver Valley N.S.*

Big Rock Point 1 N.S.

Browns Ferry 1 N.S Browns Ferry 2 N.S.

Browns Ferry 3 N.S.

Brunswick 1 N.S.

Brunswick 2 N.S.

D. C. Cook i N.S.

Dresden 1 N.S.

Dresden 2 N.S.

Dresden 3 N.S.

James A. FitzPatrick 4b44L 10/79 JACII 11/79

~

Hatch 1 9/79 9/79 indian Point 2 N.S.

Indian Point 3 N.S.

Kewaunee 1 N.S.

Lacrosse N.S.

Maine Yankee N.S.

Monticello 9/79 9/79 Oyster Creek N.S.

Palisades N.S.

Quad lities 1 N.S.

Quad Cities 2 N.S.

Zicn 1 N.S.

Zion 2 N.S.

Inree Mile Island 1 N.S.

Crystal River 3 N.S.

n

} J e) l' III. RPS Power Supply Licensing Action Completed Completed Issued By Contractor By PSB By PM Browns Fe, ry 1 9/79 9/79

-Browns Ferry 2 9/79-9/79 Browns Ferry 3 9/79 9/79 Brunswick i N.S.

Brunswick 2 N.S.

Cooper N.S.

Dresden 1 N.S.

Dresden 2 N.S.

Dresden 3 N.S.

Duane Arnold N.S.

Fi tzPatrick N.S.

Hatch 1 7/79C 8/79C Monticello N.S.

Nine Mile Point N.S.

Pilgrim 1 N.S.

Peach Bottom 2 N.S.

Peach Bottom 3 N.S.

Quad Cities 1 N.S.

Quad Cities 2 N.S.

Vermont Yankee N.S.

Big Rock Point N.S.

Lacrosse N ~. S.

Oyster Creek N.S.

Millstone 1 N.S.

IV.

SI Block Rocinson 2 9/79 C 9779 Surry 1 9/79 9/79 Surry 2 9/79 9/79 Turkey Point 3 9/79 9/79

^

Tarkey Point 4 9/79 9/79 0

133

, V.

Inadvertent Safety Injection Licensing Action Completed Com-1 e te d Issued By'. Con tracto r B, PSB By PM Salem 7479 9/79 effs 9/79 VI. Containment Isola. tion Big Rock Point 1 5/79C 6/79C 7/79C VII.

Standby Gas Treatment Browns Ferry 1/79C 1/79C 3/79C VIII.

Tech. Spec. Change St. Lucie 1 8/79C 9/79

~0 134

ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPORT Contractor - LLL PSB Task Manager - Paul Shemanski Total Number of Licensing Or General Actions Assigned -.147 Total Number of Licensing Or Generic Actions To Be Completed By LLL in FY 79 - 49 Number completed by Contractor - 20 PSB

-18 P.M.

-5 Total Planned Cost - $497K Funds Expended - 1st Q'uarter - $90K ;

2nd Quarter -$156K 3rd Quarter - $280K ;

4th Quarter - $437K - Estimate I.

OverPressu-i zation Licensing Action Completed Completed Issued By Contractor By PSB By PM Millstone 2 6/78C 8/78C 3/79C H. B. Robinson 6/78C 8/78C Haddam Neck 3/79C 8/79C Point Beach 1 3/79C 8/79C Point Beach 2 3/79C 8/79C Salem 3/79C 8/79C Maine Yankee 8/79C 8/79C Yankee Rcwe 8/790.

8/79C Trojan

-9/79 N.S.

9411 N.S.

Beaver Valley 7777 N.S.

MEp?? N.S.

Kewaunee

-eA79 9/79 9/79 San Onofre 9/79 9/79

  • NS - Not schedule to be completed in FY 79.

'~0 135

. _ _. II.

Flooding Licensing Action Completed Completed Issued By Contractor By PSB By PM Surry 1 NS*

Surry 2 N.S.

San Onofre 1 N.S.

Yankee Rowe N.S.

Maine Yankee N.S.

Palisades 9/79 9/79 Indian Point 2 N.S.

Turkey Point 3 9/79C 9/79C Turkey Point 4 9/79C 9/79C III. Degraded Grid Voltage Haddam Neck 9/79 9/79 Ginna 9/79 9/79 Millstone 1 N.S.

Peach Bottom 2 N.S.

Peach Bottom 3 N.S.

. Point Beach 1 9/79~

9/79 Point Beach 2 9/79 9/79 Pilgrim 1 9/79 9/79 San Onofre 1 N.S.

Prairie Island 1 N.S.

Prairie Island 2 N.S.

Robinson 2 N.S.

St. Lucie 1 N.S.

Turkey Point 3 N.S.

Turkey Point ?

N.S.

Surry 1 N.S.

Surry 2 N.S.

0 136 III.

Degraded Grid Voltage (cont.)

Licensing Action Completed Completed Issued By Contractor By PSB By PM Vermont Yankee N.S.

Yankee Rowe N.S.

Salem i N.S.

Rancho Seco N.S.

IV. N-1 Loop Operation Monticello W 9/79 W-74 9/79 Brunswick 2 9/79 9/79 Vermont Yankee N.S.

Zion N.S.

Dresden 2 N.S.

Beaver Valley 9/79 9/79 V.

Tech Spec Change - Deletion of Reactor Trip On Turbine Trip Below 50% Power Prairie Island 1 1/79C 1/79C 3/79C Prairie Island 2 1/79C 1/79C 3/79C Beaver Valley 8/79C 9/79C 9/79C J. M. Farley 8/79C 9/79 C 9/79C VI. ECCS Electrical Analysis

rai-ie Island N.S.

5WR 3 - Generic N.S.

0 137 VII.

End Of Cycle Reactor Pump Trip Circuitry Licensing Action Completed Completed Issued By Contractor By PSB By PM Hatch I

  1. 4 9/79 8/ 19 9/79 Brunswick 2
  1. 4 9/79 4 Fr0 9/79 Brunswick 1

-C-F4 9/79 4 F4 9/79 Cooper N.S.

Dresden 1 N.S.

Dresden 2 N.S.

Dresden 3 N.S.

Duane Arnold N.S.

FitzPatrick N.S.

Monticello N.S.

Nine Mile Point N.S.

Pilgrim 1 N.S.

Peach Bottom 2 N.S.

Peach Bottom 3 N.S.

Quad Cities 1 N.S.

Quad Cities 2 N.S.

. Vermont Yankee N.S.

Big Rock Point N.S.

Lacrosse N.S.

Oyster Creek N.S.

Millstone 1 N.S.

VIII.

Electrical Bypass Of Safety Actuation Signals To Containment Purge Valves Pc'n: Beach 1 9/79 9/79 Point Beach 2 9/79 9/79 Kewaunee 9/79 9/79 fi 1 3 8 Licensing Action' Completed Completed Issued By Contractor By PSB By PM Brunswick 1 9/79' 9/79 Brunswick 2 9/79 9/79 Ft. Calhoun 9/79 9/79

'Oconee 1 9/79 9/79 Oconee 2 9/79 9/79 Oconee 3 9/79 9/79

~ Peach Bottom 2 9/79 9/79 Peach Bottom 3 9/79 9/79 Cook 1 9/79 9/79 Cook 2 9/79 9/79 Ginna N.S.

. Turkey Point 3 N.S.

Turkey Point 4 N.S.

Big Rock N.S.

Cooper-N.S.

Crystal River 3 N.S.

Browns Ferry 1 N.S.

Browns Ferry 2 N.S.

Zion 1 N.S.

Zion 2 H.S.

Quad Cities 1 N.S.

Quad Cities 2 N.S.

Farley N.S.

FitzPatrick N.S.

Hatch 1 N.S.

Calvert Cliff 1 N.S.

Calvert Cliff 2 N.S.

Haddam Neck N.S.

Dresden 2 N.S.

Cresden 3 N.S.

Indian Point 2 N.S.

Indian Point 3 N.S.

Palisades N.S.

Prairic Island 1 N.S.

"~0 139 Browns Ferry 3 N.S.

Licensing Action-Completed Completed Issued By Contractor By PSB By PM Prairie Island 2,

N.S.

San Onofre 1 N.S.

Nine Mile Point N.S.

Oyster Creek N. S,.

Pilgrim 1 N.S.

Monticello N.S.

Humboldt Bay 3 N.S.

Hatch 2 N.S.

Dresden 1 N.S.

St. Lucie 1 N.S.

Rancho Seco N.S.

Salem N.S.

Arkansas 1 N.S.

Davis Besse N.S.

Duane Arnold N.S.

Maine Yankee N.S.

Robinson 2 N.S.

Trojan N.S.

Beavery Valley N.S.

Conn Yankee N.S.

North Anna N.S.

Surry 1 N.S.

~Surry 2 N.S.

Yankee Rowe N,S.

-~

VIII.

Alternative To Key Lock Control Of Bypass Valve Davis Besse 1 9/79 C 9/79 C -

IX.

Testing Of Noise Isolation In RPS and ESFAE Davis Besse 2 9/79 9/79 0

140

^

e X.

Single Failure Evaluation Of Reactor Coolant Flow Sensing Lines Licensing Action Completed Completed Issued By Contractor By PSB By PM Crystal River 3 N.S.

XI.

Tech. Spec. Changes Big Rock Point 4V79 9/79 9/79 XII. On Call Assistance Cable Leakage 10/78C ll/78C Tine Ext. DB1 6/79C 6/79C XIII.

Steam Line Break ?rotection System Beaver Valley 4Y4'4r 9/79 9/79 XIV.

Diesel Generator Status Annunciators Generic 9/79 C 9/79 XV.

ATWS Recirculation Pump Trip Generi c 6/79C S/79'C ca'I.

LPR'4 Moni tors Gene ric 6/79C 8/79 9/79

^~0 141

STEAM GENERATOR WATERHAMMER Contractor - EG&G PSB Task Manager - Sam MacKay Total Number of Licensing Actions Assigned To The Contractor

_22 Total Number of Licensing Actions To Be Completed By EG&G In FY 1979 17 Total Planned Cost - 157K Funds Expended - 1st Quarter -

2nd Quarter To Date

3rd Quarter - $62K ; 4th Quarter - $112K - Estimate LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.

Beaver Valley, 12/78C 1/79C 2/79C Cook 1 1/79C 1/79C 3/79C Indian Point 2 1/79C 1/79C 7/79C Salem 11/.'T 1/79C Zion 1 4/79C 6/79 9/79 Zion 2 4/79C 6/79 9/79 Point Beach 1 6/79C

-7/-79 9/79 Point Beach 2 6/79C 7/79 9/79 Kewaunee 6/79C

-7/79 9/79 Turkey Point 3 9/79~

10/79 Turkey Point 4 9/.79 10/79 Prairie Island 1 7/79C 7/79 9/79 Prairie Island 2 7/79 C 7/79 9/79 Conn. Yankee 9/79 10/79 San Onofre 1 9/79 10/79 Ginna 9/79 10/79 Trojan 9/79 10/79 Yankee Rowe 10/79 11/79 Palisades 11/79 12/79 Maine Yankee 11/79 12/79 Millstone 2 11/79 12/79 St. Lucie 10/79 11/79 O

142 N.S. = Not scheduled to be completed by EG&G in FY 1979.

INSERVICE TESTING PROGRAM Contractor: BNL PSB Task Manager - Allan Wang Total Number of Licensing Actions Assigned To Contractor - 15 Total Number of Licensing Actions To Be Completed by BNL in FY 79 - 7' Total Planned Cost - 200K Funds Expended - 1st Quarter -

2nd Quarter -$83K; To Date

3rd Quarter -

4th Quarter -$200K - Estimate LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.

Arkansas 1 6/79C Conn. Yankee *

-8/79 10/79 Cooper *

-7/79 9/79 San Onofre 1*

-8/79 9/79 Three Mile Island 1*

-9/79 10/79 Kewaunee

-NrSr 10/79 Browns Ferry 3

-8/79 9/79

' Indian Point 2.

-NrSr 10/79 Yankee Rowe 9/79C FitzPatrick

-9/79 11/79 Browns Ferry 1

-8/79 9/79 Browns Ferry 2

-8/79 9/79 Pilgrim 1 NrSe 10/79 Point Beach 1

-N-S-1/80 Point Beach 2

-N-S-1/80

  • ncludes ISI review as well as IST review.
    • NS - Not scheduled to be completed by BNL in FY 1979.

0 143

OFFSITE POWER SYSTEM STUDY

~

Contractor - ORNL PSB TASK MANAGER:

M. Chiramal TOTAL NUMBER OF GENERIC ACTIONS PLANNED FOR FY 1979 -

7 TOTAL PLANNED COST - 120K FUNDS EXPENDED - 1st Quarter - $37K ; 2nd Quarter - $71K To Date:

3rd Quarter - $93K ; 4th Quarter - $131K - Estimate Completed Completed Generic Reports By Contractor By PSB Task A - Evaluation of Failures 7/79C of the entire offsite power system to determine systens designs in compliance with GDC-17.

Task B - Evaluation of loss of Cancelled NA preferred offiste power systems to determine system designs in compliance with GDC-17

~

Task Cl Loss of offsite power survey Cancelled - DOR staff to accomplish Task C2 Determination of maximum 12/78 C frequency decay rate Task C3 Grid sensitivity matrix 7/79 C Task C4 Analytic program for 8/79 C determining alert conditions Task C5 Long range dynamic calcu-4/79 C

lations Task C6 Final report 9/79

  • To be issued as a NUREG report.

"~0 144

MARK I CONTAINMENT ASSESSMENT CONTRACTOR - BNL PSB TASK MANAGER - C. Grimes TOTAL NUMBER OF GENERIC ACTIONS PLANNED FOR FY 1979

- 7 TOTAL PLANNED COST - 200K FUNDS EXPENDED - 1st Quarter -

2nd Quarter - 107K To Date

3rd Quarter

4th Quarter -$190K - Estimate Completed Completed Generic Actions By Contractor By PSB 7

-./_73_C Task I 1/4 scale pool swell tests 6/79 C Task II Condensation Oscilla-3HS.C tions 7/79 C

- _/_7_9_C 6

Task III Pool Swell Studies 6/79 C

-_/_7_9,C 6

Task IV Load Comparisons 6/79 C Task V Fluid-Structure inter-7/79C actions 7/79C Task VI Load Defin'ition Report

-%A79 9/79 Task VII Summary Evaluation Report

-9A74 10/79

  • To be issued as a NUREG report.

0 1 ?+ 5

FIRE PROTECTION PROGRAM REVIEW Contractor - BNL PSB Task Manager - Ernest Sylvester

~

Total Number of Licensing Actions Assigned to Centractor - 119 Total Number of Licensing Actions To Be Completed By BNL in FY 1979 - 42 Number Completed By Contractor - 32 PSB

- 32*

P.M.

- 25 Total Planned Cost - 500K Funds Expended - 1st Quarter -

2nd - 179K To Date

3rd Quarter -

4th Quarter - 480V - Estimate I.

Fire Protection SER's LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.

Beaver Valley.

6/79C I&E 6/79C Big, Rock Point 3/79C 3/79C 4/79C Calvert Cliffs 1 6/79C 5/79C Calvert Cliffs 2 6/79C 5/79C Cooper 2/79C I&E 5/79C Crystal River 3 6/79C I&E 7/79C Dresden 1 6/79C 5/79C 5/79C Fit: Patrick 1/79C 1/79C 8/79C Ginna 12/78C 12/78C 2/79C Indian Point 2 12/78C 12/78C 1/79C Indian Point 3 3/79C 12/78C 3/79C Lacrosse 4/79C 3/79C 7/79C Monti cello 6/79C 5/79C 8/79C Nine Mile Point 5/79C I&E 7/79C Peacn Bottom 2 4/79C 3/79C 5/79C Peach Botton 3 4/79C 3/79C 5/79C Point Beach 1 4/79C 1/?SC 8/79C Point Beach 2 4/79C 1/78C 8/79C Prairie Island 1 6/79C 5/79C 9/79C Frairie Island 2 6/79C 5/79C 9/79C

  • Includes 5 plant reviews by I&E

~ ]

1 / (')

LICENSING ACTION COMPLETED COMPLETED ISSn,0 BY BY CONTRACTOR BY PSB v.M.

Quad Cities 1 4/79C 3/79C 7/79C Quad Cities 2 4/79C 3/79C 7/79C Saint Lucie 1

-6/79-7/79C I&E 8/79C San Onofre 1 1/79C 12/78C 7/79C Turkey Point 3 12/78C.

8/78C 3/79C Turkey Point 4 12/78C 8/78C 3/79C Yankee Rowe 3/78C 1/7PC 3/79C Surry 1 t/79 C 8/79C Surry 2 f/79 C.

8/79C II. Fire Protection Supplements Brunswick 1 4/79C 4/79C 4/79C Brunswick 2 4/79C 4/79C 4/79C Trojan

~~

Kewaunee Indian Point 3 4Y76h 12/79 Oyster Creek Big Rock Point Haddam Neck

- 4/ 9/79 Millstone 1 9/79 Maine Yankee 9/79 H. B. Robinson

-fff4L N.S.

Palisades N.S.

Rancho Seco N.S.

Millstone 2

- +her.- 9/79 Vermont Yankee N.S.

Zion 1 N.S.

Zion 2 N.S.

Quac Cities 1 N.S.

Quad Cities 2 N.S.

Drescen 1 N.S.

San Onofre 1.

N.S.

Yankee Rcwe N.S.

  • To be done by 70R sta#-

Duane Arnold N.S.

Dresden 2 6/79C 6/79C Dresden 3 6/79C 6/79C 0

117

LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.

Peach Bottom 2 N.S.

Turkey Point 2 N.S.

Turkey Point 3 N.S!

Point Beach 1 N.S.

Point Beach 2 N.S.

Monticello N.S. -

Prairie Island 1 N.S.

Prairie Island 2 N.S.

Surry 1 N.5, Surry 2 N.S.

Ft. Calhoun N.S.

Three Mile Island 1 N.S.

Three Mile Island 2 N.S.

FitzPatrick N.S.

Calvert Cliffs 1 N.S.

Calvert Cliffs 2 N.S.

Ginna N.S.

Lacrosse N.S.

Peach Bottom 3 N.S.

III.

Fire Protection Design Reviews Troj an Dresden 2 f54%h N.S.

Dresden 3

-7Fr9-N.S.

Haddam Neck ihAFE 9/79 Millstone 1 9/79 Maine Yankee 9/79 H. B. Robinson HEb??

N.S.

Kewaunee N.S.

Indian Point 3 N.S.

Oyster Creek N.S.

Big Rock Point N.S.

Palisades N.S.

Rancho Seco N.S.

N.S. - Not scheduled to be completed by BNL in FY 1979.

  • To be done by DOR staff g

l4g

4 LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CO,N, TRACTOR, _,

,, B {,P S B,,,,

P.M.

Arkansas 2 N.S.

Arkansas 1 N.S.

Indian Point 2 N.S.

Oconee 1 N.S.

Oconee 2 N.S.

Oconee 3 N.S.

Brunswick 1 N.S.

Brunswick 2 N.S.

Millstone 2 4+.-S.- 9/79 Vermont Yankee 4&cSe 9/79 Zion 1 N.S.

Zion 2 N.S.

Quad Cities 1 N.S.

Quad Cities 2 N.S.

Dresden 1 N.S.

San Onofre N.S.

Yankee Rowe N.S.

Quane Arnold N.S.

Turkey Point 3 N.S.

Turkey Point 4 N.S.

Peach Bottom 2 N.S.

Peach Bottom 3 N.S.

Point Beach 1 N.S.

Point Beach 2 N.S.

Monticello N.S.

Prairie Island 1 N.S.

Prairie Island 2 N.S.

Surry 1 N.S.

Surry 2 N.S.

Ft. Calhoun N.S.

Three Mile Island 1 N.S.

Three Mile Is1:nd 2 N.S.

Pilgrim i N.S.

N.S. = Not Scneduled to be completed by BNL in FY 1979

}

}49

LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.

FitzPatrick N.S;

  • Calvert Cliffs 1 N.S.

Calvert Cliffs 2 N.S.

Ginna N.S.

Lacrosse N.S.

IV.

Fire Protection - Items Deferred To SEP' Yankee Rowe Haddam Neck Millstone 1 Lacrosse

~~

Dresden 1 Dresden 2 San Onofre Ginna N.S. - Not Scheduled to be completed by BNL in FY 1979.

O 150

=

GENERIC ACTIONS COMPLETED COMPLETED BY CONTRACTOR BY PSB A.

Acceptance Criteria

1.. Safe Shutdown Capability 6/79C 6/79C
2. ' Fire Brigade Size and Training.

3.

Associated Non-Safety Circuits 9/79 4.

Reactor Coolant Oil Collection System 9/79 5.

Fire Retardants 12/79 6.

Water Shields 12/79 7.

In-Situ Testinf of Smoke Detection Sys tens 2/80 B.

Feedback Memos 1.

Lessons Learned from the Application of Fire Protection Guidelines to Operating Reactors 10/79 2.

Assessment of Fires Occurring At Operating Reactors 11/79 3.

Assessment of the Use of Administrative Controls for Fire Protection In Lieu of Hardware Changes 11/79 C.

BNL Studies 1.

Methodology of Manual Fire Fighting As Applied to Operating Nuclear Power Plants 8/79C D.

PSB Section C Studies 1.

Monthly Licensee Reports N.S.

2.

LER's N.S.

3.

BWR Primary Containment Fire Protection N.S.

~

0 151

.-