Forwards IE Insp Repts 50-369/79-28 & 50-370/79-16 on 790808-10.No Noncompliance Noted
ML19249E786
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/22/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19249E784 List:
References
NUDOCS 7910020427
Download: ML19249E786 (2)


See also: IR 05000369/1979028

Text

o

/

'o

UNITED STATES

!'

' 7,

NUCLEAR REGULATORY COMMISSION

3m

.

$._

" _ ' . $

REGION 11

o,

[

101 MARIETT A sT., N.W., sulTE 3100

ATLANT A, GEORGI A 30303

[

  • ...+

In Reply Refer To:

A

2 2 1979

RII:MDH

50-369/7-28

-

50-370/79 16

Duke Power Company

Atta:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on

August 8-10, 1979 of activities authorized by NRC Constroction Permit

Nos. CPPR-83 and CPPR-84 for the McGuire Nuclear Power Plant facility,

Unit Nos. I and 2, and to the dis.ussion of our findings held with

G. W. Grier at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters. These are discussed in the enclosed inspection

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

1070

553

0M

q 291002

.

.

AU6 2 2 I979

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

_

Sincerely,

}

e

C. E. Murphy, Chi f

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-369/79-28

and 50-370/79-16

cc w/ enclosures:

M. D. McIntosh, Plant Manager

Post Office Box 488

Cornelius, North Carolina 28031

J. C. Rogers, Project Manager

Post Office Box 33189

Charlotte, North Carolina 28242