ML19249E484
| ML19249E484 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/16/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML19249E483 | List: |
| References | |
| 780616, NUDOCS 7910010574 | |
| Download: ML19249E484 (2) | |
See also: IR 05000416/1978008
Text
['
.
UNITED ST ATES
,
.,
[pa pecuf*'o,
NUCLE AR REGULATORY COMMISSION
/ . ,,
h
/[
'
.
,
, f[
,
f,
[,
$
230 PE ACHT RE E sT REET. N.W. SulTE 1217
I
oi,
[
ATL ANT A, GEORGI A 30303
/
'/
t
g " .v
,e
- ..*
In Reply Refer To:
UUE 1 0 I378
RII:VLB
50-416/78-8
50-417/78-8
.
Mississippi Power and Light Company
Attn:
Mr. Norr's L. Stampicy
Vice President of Production
P. O. Box 1640
Jackson, Mississippi
39205
.
Gentlemen:
I
.
This refers to the inspection conducted by Mr. V. L. Brownlee of this
office on May 16-19, 1978, of activities authorized by NRC Construction
Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf Units 1 and 2
f acilities, and to the discussion of our findings held with Mr. T. E. Reaves
at the conclusion of the inspection.
(
Areas examined during the inspection and our findings are discussed in
the enclered inspecticn report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
These are discussed in the enclosed inspection
fled enforcement matters.
report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
If this report contains any information that you (or
Document Room.
your contractor) believe to be proprietary, it is necessary that you
make a writ ten application within 20 days to this of fice to withhold
such information from public disclosure.
Any such application must
is
include a f ull statement of the reasons on the basis of which it
(
k&)
'
1032
'
'
- 9100 10 N7q
^
.
.. .
t
-2-
JUN i 6 E78
Mississippi Power and Light Co.
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
If we do not hear from you in this
in a separate part of the document.
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
J
WW
W
>
/
l
C. E. Murphy, Chief
i,"73-
Reactor Construction and
Engineering Support Branch
.
Enclosure:
Inspection Report Nos.
50-416/78-8 and 50-417/78-8
I
cc w/ encl:
Mr . k'. L. Nail
Plant Superintendent
P. O. Box 756
Port Gibson, Mississippi 39150
i
1
.
{