UNIT ED sT AT Es
+[t** 8 f C 9[o,,
NUCLEAR REGULATORY COMMISSION
0
REGloN il
\\
o
2
'
g. ,
$
230 PE ACHT REE sT REET, N W. sulT E 1217
8
- 4
/
8
o)f*....f
~
%
Report Nos.: 50-416/78-08 and 50-417/78-08
Docket Nos.: 50-416 and 50-417
License Nos.:
CPPR-118 and CPPR-119
Categories:
A2, A2
Licensee: Mississippi Power and Light Company
P. O. Box 1640
Jackson, Mississippi 39205
Facility Name:
Grand Gulf Nuclear Station, Units 1 and 2
g
Inspection at:
Grand Gulf, Mississippi
inspection conducted: May 16-19, 1978
(
Inspectors:
V. L. Brownlee
Nl
%' .
.
au
I
/
Reviewed by:
Date
A. R. Herdt, Chief
Projects Section
Reactor Construction and Engineering Support Branch
Inspection Summary
Inspection on May_16-19,1978 (Report Nos. 50 I~ ^ '78-08 and 50-417/78-08
Mid Term QA Inspection TUr
. and 2]; 10 CFR 21
-
Areas Inspected:
TUnits 1 and 27; IE Bulletins (Units 1 and 2,; concrete (Unit 2); storm
damage (Units 1 and 2); reactor vessel internals (Unit 1); warehousing
(Units 1 and 2); fire protection (Units 1 and 2).
The inspection involved
55 inspector-hours on site by two h7C inspectors.
Results: No items of noncompliance or deviations were disclosed.
(
7910010 f/cf
1032 ':J
.
.
~(
RII Rpt. Nos. 50-416/78-8
I-1
and 50-417/78-8
1
TTA.
h8
.
'
DETAILS I
Prepared by:
-rownlee, Principal Inspector
ae
V. L.
Projects Section
-
Reactor Construction and Engineering
Support Branch
Dates of Inspection:
ay
6-19, 1978
7h
Reviewed by:
A
i te
A. R. Herdt, Chief
Projects Section
Reactor Construction and Engineering
l
Support Branch
!
l
1.
Persons Contacted
Mississippi Power and Ligh_t Company (MP&L)_
a.
- T. E. Reaves, Jr., Manager of Quality Assurance (QA)
- P. V. Sly, QA Field Supervisor
G. E. Osborn, Construction Supervisor
D. F. Mahoney, Mechanical QA Representative
J. C. Fuller, Piping QA Representative
b.
Contractor Organization
Bechtel Power Corporation (Bechtel)_
- R. L. Scott, Project QA Manager
T. L. Lee, Lead Superintendent, Night Shift
- D. W. Strohman, QA Engineer
- J. L. Martin, QA Engineer
The inspector interviewed 16 other licensee or contractor employees
during the course of the inspection. They included records, QC,
warehousing, supervisors and labor personnel.
- Denotes those present at the exit interview.
Licensee Action on Previous Insp.ection Findings,
2.
(Closed) 417/78-06-01 Failure to Follow Specification
for Velding of Containment Liner
(
The letter has
MP&L filed the letter of response on May 1. , l'78.
been reviewed by the IE:II responsible engineers and is detennined
1032
'
?
.-(
R11 Rpt. Nos. 50-416/78-8
and 50-417/78-8
I-2
to be acceptable.
The inspector verified that the specification
has been changed to correct the discrepancy between the specification
and welding procedure.
3.
Unresalved Items
There were no new unresolved items identified as a result of this
inspection.
4.
Independent Inspection Effort
Organization Changes (MP&L)
a.
i
Mr. J. E. Wimberly, MP&L Construction Supervisor, has lef t the
zmployment of MP&L to accept employment with Gulf States
j
Utilities at the River Bend project.
Mr. G. E. Osborne,
previous MP&L civil QA representative has replaced Mr. Wimberly.
b.
Contractor Changes
I
The contract with the heat and vent duct contractor, IRSAY,
Skokie, Illinois, has been cancelled. The contractor was
performing both safety and non-safety related work.
Records
from IRSAY were turned over to Bechtel QC records prior to
IRSAY leaving the site.
General Mechanical Contractors has
been contracted to complete the heat and vent duct work.
c.
General Site Inspection
The inspector walked through Unit I and 2 facilities observing
general storm damage to the main structures and support facilities.
Additionally the inspector observed concreting prepour and
placement activities relative to Unit 2 and walked through the
main warehouse.
Considerable discussion was held with MP&L
management relative to the project schedule.
5.
Partial Mid-
Term Construction Permit QA Inspection - Field Procurement
TUnits 1 and 2)
The inspector reviewed the on-site program for procurce nt of
structural support material.
Bechtel Specification Nos. 9645-C-
121.0, 9645-C-131.0, and 9645-C-151.0 are the specifications for
the furnishing of structural steel for category I structures;
miscellaneous and embedded steel and iron for Category I structures;
k
and containment, drywell and suppression pool respectively.
Bechtel
Nuclear QA Manual Policy Nos. QGG-4.1 and QGG-7.1 defines home
office and field procurement policies and source evaluation and
selection policies.
Bechtel Work Plan Procedure WP/P-9 instructs
the field engineer on how to initiate the field material requisition
- pz,
,m
,
,_ J
U J f.
t
.
.
(
RI-I Rpt. Nos. 50-416/78-8
and 50-417/78-8
I-3
forms.
Bechtel QA Instruction No. 4.1-1 instructs the project QC
Group on how to review and approve the field material requisitions.
The Field Procurement Individiual Jobsite Instructions describe how
field procurement performs their functions. The procurement depart-
ment utilizes an approved venders list for selection of bidders.
The inspector selected purchase order Nos. 9645-F-25346 and 9645-F-
25714, for structural materials, to determine whether the QA canual
procedures were implemented, whether the specification requirements
were imposed, whether supplier documentation was required, whether
the supplier was prequalified, and that the field QC records contained
the required documents.
The material requisitions were in order
and properly reviewed and signed off; the purchase orders referenced
!
the applicable specification, materials, tests reports, part 21 and
documentation requirements; the field QC records contained the
Material Receiving Instruction and Inspection Record, Material
Receiving Report, Documentation Requirement Forms, Material Test
Reports and purchase orders,
f
No items of noncompliance or deviations were identified.
6.
10 CFR 21 Inspection
The inspector selected Purchase Order Nos. 9645-M205.1, Rev. 21;
9645-M-257.0, Rev. 16; 9645-C-121.0, Rev. 35; 9645-M-062.0, Rev. 9;
9645-M-300.0, Rev. 21; F-25346; and F-25918 to verify that purchase
documents initiated at Gaithersburg and at the site were including
the Part 21 clause. The inspector confirmed that all purchase
orders did include the part 21 clause.
Additionally the inspector verified that three on site subcontractors
were complying with the posting requirements of Part 21.
During the period of the inspection the licensee discovered that
Bechtel subcontracting had failed to impose Part 21 requirements on
a subcontractor, General Mechanical Contractors (See Paragraph 4.b
above). This matter was quickly corrected by amending the contract
to impose Part 21 requirements.
No items of noncompliance or deviation were identified.
7.
(Closed) IEB 77-08 - Assurance of_ Safety _and Safeguards During
an Emergency - Locking Systems (Units 1 and 2)
_
I
MP&L letter of March 16, 1978, reports that MP&L has concluded
their review and that the design of the facility together with the
emergency and security plan will adequately meet the criteria set
forth in the bulletin.
IE:II has no further questions regarding
this matter.
,
10Jf.
.
a
'I
.
R11 Rpt. Nos. 50-416/78-8
and 50-417/78-8
I-4
8.
(Closed) IEB 78-02 - Terminal Block Qualification (Units 1 and 2)
MP&L letter of March 9, 1978, reports that no such unprotected
terminal blocks will be used in the described service. MP&L plans
to protect all such terminal blocks by enclosing them in boxes
which meet or exceed NEMA Type 12 requirements.
IE:II has no
further questions regarding this matter.
9.
Licensee Identified Item
Small Fire - Reactor Vessel Pedestal Area (Unit 1)
!
On April 4, 1978 MP&L notified IE:II of the occurrence of a small
j
fire which had developed underneath Unit I reactor vessel. The
fire was determined to have been caused by an electrical short in
110 volt extension trouble light. The short ignited some plastic
a
covers and burlap which burned for less than two minutes. The fire
extinguished with a dry chemical type extinguisher.
The reactor
vessel bottom head was filled with black soot and powder from the
I
extinguisher was adhering to the inside of the vessel skirt and the
Leue; of the vessel.
Ash and powder fell to the control red drive
piping work platform and on the insert withdraw lines.
-
The inspector reviewed the Bechtel Safety Department Fire Report;
the Bechtel, Reactor Controls Incorporated; General Electric I&SE
nonconformate reports; and the General Electric hTD engineering
evaluation and cleanup instructions. MP&L and their contractors
have concluded that there was no damage to safety related equipment.
This matter is thoroughly documented in on-site records and appears
to have received adequa e attention.
IE:II has no further questions
regarding this matter.
10.
Management Interview
The inspector met with the licensee representatives (denoted in
paragraph 1) at the conclusion of the inspection on May 19, 1978.
The inspector summarized the scope of the inspection as follows:
Licensee action on previous inspection findings; independent inspec-
tion effort; mid-term QA; IE Bulletins; 10 CFR 21; and licensee
identified items.
No items of noncompliance were identified.
(
1032
2
-
.
't
RII Rpt. No. 50-416/78-08
and 50-417/78-08
11-1
[!O/9
W. B. Swan,[ Civil Engineer
,
Date
_k
h
DETAILS II
Prepared by:
,
Engineering Support Section No. 1
Reactor Construction and Engineering
Support Branch
Dates of Inspection: May 16-19, 1978
pf
p j)g
Reviewed by:_
C. Bryahf, Chief
Date
..ngineering Support Section No. 1
Reactor Construction and Engineering
Support Branch
i
1.
Persons Contacted
Mississipy_i Pcver and Light Companj- (MP&L)
a.
T. E. Reaves, Jr., Manager, Quality Assurance (QA)
i
G. E. Osborn,
Nuclear Construction Supervisor
- P. W. Sly, Quality Assurance Field Supervisor
D. F. Mahoney, QA Repres :ntative, Mechanical
S. F. Tanner, QA Represei tative, Welding and NDE
J. C. Fuller, QA Representative, Piping
b.
Contractor OrEanizations
(1)
Bechtel Power Corporation _(Bechtel)
_
R. L. Scott, Project QA Manager
- D. W. Strohman, Quality Assurance Engineer
T. L. Lee, Construction Superintendent, Second Chift
- J. L. Martin, QA Engineer, Civil
R. Ingraham, Froject Safety Supervisor
(2)
General Electric Cogany__ Installation and Services
Engineering _ Division (16SE)
D. Orr, We ding Supervisor
- Denotes those present at the exit interview.
2.
Licensee Action on Previous Inspection Findings
(
This area was not inspected.
1032
.J
..
(
RII Rpt. Nos. 50-416/78-08
- and 50-417/78-08
Il-2
3.
Unresolved Items
Unresolved items are matter about wh?ch more information is required
in order to ascertain whether they are acceptable items, items of
noncompliance, or deviations.
An unresolved item disclosed during
the inspection is discussed in Paragraph 4.
4.
Independent _ Inspection Effort
a.
Warehouse:
During a backshift inspection, the Bechtel receiving warehouse
on site vas inspected. As an added precaution, metal cabinets
!
housing c >ntainers of flammables have been moved outside the
l
warehouse.
This prevents the possibility of fires near stored
Class I materials and equipment caused by inadvertancies such
as piercing a cabinet with fork lift prongs.
b.
Concrete Placement:
i
The inspectors observed a night shift placement of a portion
of a 2,700 cubic yards section of the foundatica cat of the
Unit 2 auxiliary building under WP61R Q2 T-21-W-21093 using
CC2 mix.
For each 50 yards, sampling was done et the mixer
discharge site into the trucks. For each 500 cubic yards,
samples were taken at a pump line discharge.
In review of the concrete mixer report, test data and the QC-
2C Supplement Report for pump line discharge sample test data,
the inspector noted some apparent improbabilities.
The four
samples taken had a recorded slump of 2 1/2 inches although
the same mixes sampled at the mixer had variable slumps.
Also, the recorded air entrainment percentages recorded show a
reducing differential, or drop, in slump as the pipelines were
shortened, an actual rise for one case (4.5% at the mixer,
2.8% at the truck discharge and a rise to 3.7% at the end of
the pump line.) The inspector challenged these aberrations.
MP&L QA had Bechtel QA mnd QC engineers review the data and
confer with Pittsburg test laboratories.
PTL maintained that
the test data had been recorded correctly.
This indicated
that perhaps the instructions for recording slump measurements
at the pump line end may have been misunderstood by the technician
and the air entrainment measurement devices might be out of
(
calibration or the measuring technique not followed correctly
1032
i;
Nos. 50-416/78-0S
.
f
RII Rpt.
11-3
and 50-417/78-08
the
The licensee was told that
at one or the other locations.
417/78-08-01,
matter would be left as an unresolved item,
requiring recalibration of the air entrainment meters, PTL
review of techniques for air measurement and measuring and
specifica-
recording slumps, and licensee review of the latest
be
tion revisions to determine that slump of concrete to
conveyed by Cretercrane is adequately controlled.
Batch Plant Operations _:
c.
The inspectors observed batching and sample taking and testing.
1_:
Reactor Vessel Internals Installation, Unit
d.
The inspector entered the reactor vessel dur!ng
4
l
installed brackets, supports, in process diffusers, and one
Access and
installed diffuser and its rams head sections.
cleanliness controls to the vessel were being imposed.
In the four areas inspected, no noncompliances with quality
In the concrete area one
recuit tnents were identified.
unresolved item was developed.
Inspection of Status of Tornado Damage Corrections
5.
Four creas were considered:
a.
Unit 1 hyperbolic cooling tower
structures
b.
Unit I containment and adjunct
MP6L permanent warehouse
c.
E-'.h Plant Control trailer
d.
I cooling tower area has been evacuated by the subcontractor,
The Unit I
The Unit
who has shifted to excavation for the Unit 2 tower. insurance
tower area has been isolated by tape barriers pending
h
the
claic settlements and an engineering study and evaluation t at
damaged tower can be repaired to an insurable condition.
Tornado damaged construction equipment and scattered materials have
and adjacent areas.
Tecporary
been removed from the containmentunscheduled openings in sidings.
closures had been crected at
Cosmetic repairs to concrete and replacement with regular
1
sheathing had not been started.
!
?
.
.
O
10
L
.
- \\
Rll Rpt. Nos. 50-416/78-08
and 50-417/78-08
II-4
Dented and torn liner in the dome transition zone of the
containment has been delineated but CB&I has not been released
to start repairs.
The licensee stated that a settlement had been reached with
the insurer and work is proceeding normally in the basic plant
areas.
Wall paneling sections had been destroyed in both ends of the
MP&L warehouse. Temporary closures have been erected for
weather protection and waterials of high value have been
secured in the Category I storage room.
The batch plant
f
control trailer and control equipment had been rcplaced by
those from the back up batch plant and had been recertified.
_
l
The uniformity of a batch from the recctivated plant has been
verified by test.
6.
Procedures - Fire Prevention / Protection
The licensee's com=itments on facilities to be provided for fire
i
prevention, suppression and urotection were published in PSAR
section 3, Criterion 3 - Fi e Protection and section 9.5.1 Fire
Protec_ tion System. Additional criteria are set out in the construction
specifications and drawings.
Additional criteria and guidance are available in proposed Regulatory
Guide 1.120, Fire Protection Guidelines for Nuclear Power Flants
(out for comment until November 1978) and the NPPH, ANSI, ASTM,
IEEE, MAERP-NELPIA, and U.S. NRC regulatory guides and other Commission
documents listed in the Reference to R.G.
1.120.
The licensee is implementing, as the status of construction permits,
the requirements and guidance of the controlling criteria and
guidance through Bechtel WP&IR No. NSA 13-2-00000-Y01, Revision 3.1
dated July 7, 1977, " Procedure for Controlling and Extinguishing a
Fire on Grand Gulf Construction Site"; by supplemental field instructions,
written and verbal; by periodic scheduled training of fire brigade
personnel and by weekly inspections of fire extinguishers, hydrants,
loop line and installed sprinkler systems; housekeeping; and by a
fire permit system.
The inspector reviewed the WP&IR and the supplemental documents and
discussed them in detail with the Bechtel Project Safety Supervisor.
(
The installed permanent fire protection systems were inspected.
I
i
!
1032
- ^6
.
f
.
.
RII Rpt. Nos. 50-416/78-08
II-5
and 50-417/78-08
From the document review, inspection of hardware and discussions
with responsible personnel, the inspector determined that adequate
protection can be provided during the construction phase up to
start of Unit 1 fuel loading.
to .ontrol
Adequate and approved fire prevention procedures exist
the following during const! uction activities:
Storage, handling, and use of flarnable caterials.
a.
Storage, centrol, and use of combustible materials relative to
b.
locations of flar.mable materials and ignition sources.
I
i
Use and control of open flames and other Ignition so rces
'
c.
which may be used in areas containing flammable materials.
Adequate and approved procedures exist relative to fire suppression
during construction activities which use ignition sources and/or
flammable materials, including:
<
a.
Use, testing, naintenance, and identification of fire suppicssion
equipment.
Use, testing, maintenance, and identification of related
b.
auxiliary equipment.
Approved procedures exist relative to fire fighting activities
in the areas of:
Supervision / control
a.
b.
Action plan
c.
Communications
Approved procedures exist relative to training in the areas of
fire prevention, protection, and suppression; and training has
been conducted as specified,
t
.
1032
'm7
.
(
.
RII Pipt. Nos. 50-416/78-08
and 50-417/78-08
II-6
'
Adequate and approved procedures exist for the control nf the
procedures identified in items 1 through 4, in the areas of:
a.
Revision
b.
Approval
c.
Distribution
In the areas axamined no nonconpliance with requirements was
identified.
t
7.
Management Interview
l
An exit interview was held with Mr. P. Sly, Quality Assurance Field
Supervisor and representatives of the MP6L and Bechtel staffs.
Inspection scope and findings were discussed in the areas of tornado
damage correction, concrete, warehousing, reactor vessel internals
and project fire protection.
r
The inspector stated that an unrecolved itom in the area of concrete
had been identified, U.R.I. 417/78-08-01, as described in section 4
of these Details,
t
I
4
1032 '..]