Forwards IE Insp Repts 50-416/78-10 & 50-417/78-10 on 780621-23.No Noncompliance Noted
ML19249E478
Person / Time
Site: Grand Gulf  
Issue date: 07/11/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19249E479 List:
References
NUDOCS 7910010556
Download: ML19249E478 (2)


See also: IR 05000416/1978010

Text

[ .I

(.'

UNITE o ST ATES

// "IGr.,q%

7-

NUCLE AR REGULATORY COMMISSION

C C- ~,

' ~

Jk

'W'

'

'

REGION il

e

..!

'

i

230 PE ACHT HE E SIRE E T. N W. SUIT E 1217

f/~/

]g' )%

'

-

,5

ATL ANT A. GE oRGI A 30303

%,

f

  • e..*

JUL 11 1978

In Reply Refer To:

R11:VLB

f

50-416/78-10

J

p

50-417/78-10

I

J

{

Mississippi Power and Light Company

ATTN:

Mr. Norris L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, Mississippi 39205

.

Gentlemen:

I

j

This refers to the inspection conducted by Mr. V. L. Brownlee of this

of fice on June 21-23, 1978, of activities authorized by NRC Construction

<ermit Nos. CPPR-118 and CPPR-119 for the Grand Gulf Nuclea c Power Plant,

Unit 1 and 2 f acilities, and to the discussion of our findings held with

Mr. T. E. Reaves at the conclusion of the inspection.

(

Areas examined during the inspection and our findings are discussed in

the enclowJ luspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspec tion, no items of noncompliance were

d isclo sed .

In accordance with Sec tion 2.790 of the NRC's " Rules of Prac tice",

Part 2. Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this of fice to withhold

such information f rom public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

ti e information is proprietary, and should be prepared so

claimed that

l

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

.

\\@j

,

7910010 6 5 6

g

in79

J

'~ '

UJL

.

"i

Mississippi Power and Light

-2-

JUL 11 B78

Company (50-416/78-10 and

50-417/78-10)

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

'

w<:+

-;"1

L arlt( E. Murph , Chief

Reactor Construction & Engineering

Support Branch

l

Enclosure:

Inspection Report No s .

I

50-416/78-10 and 50-417/78-10